Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The City of Moreno Valley (Moreno Valley Electric Utility) is soliciting proposals for the design, manufacture, testing, delivery, and documentation of a three-phase, liquid-immersed, pad-mounted 4.5 MVA distribution transformer to interface with inverter-based power conversion equipment at 690 V nominal. The transformer shall be suitable for outdoor installation with ONAN cooling and tamper-resistant cabinets, meeting utility-grade standards. The solicitation includes pre-bid meeting information and an online Q&A period; documents and submittals are provided through the PlanetBids portal.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
The City of Burbank Water and Power (BWP) seeks bids to furnish a 134.1 MVA spare power transformer for the Capon and Olive Switching Stations, including technical advisory/supervision services. Submissions must conform to Technical Specification SPEC-2025-05 and include required proposal documentation and bidder’s quotation sheets via PlanetBids. Bids are due February 26, 2026 at 2:00 PM PST, with a Q&A deadline of January 14, 2026 at 2:00 PM PST.
Posted Date
Dec 30, 2025
Due Date
Feb 26, 2026
Release: Dec 30, 2025
Close: Feb 26, 2026
The City of Burbank Water and Power (BWP) seeks bids to furnish a 134.1 MVA spare power transformer for the Capon and Olive Switching Stations, including technical advisory/supervision services. Submissions must conform to Technical Specification SPEC-2025-05 and include required proposal documentation and bidder’s quotation sheets via PlanetBids. Bids are due February 26, 2026 at 2:00 PM PST, with a Q&A deadline of January 14, 2026 at 2:00 PM PST.
AvailableFurnishing and setting in place one 5 MVA substation transformer.
Posted Date
Dec 16, 2025
Due Date
Jan 27, 2026
Release: Dec 16, 2025
Close: Jan 27, 2026
Furnishing and setting in place one 5 MVA substation transformer.
Available4 EA, tr si df 1p 50 13. 8 120/240 - 50kva. Submersible single phase solid insulation distribution transformer designed for 60 hz, 100 degree average winding rise, have 13,800 volt primary, rated 95kv bil, and 240/120 volt 3 wire subtractive polarity secondary rated for 30kv bil or installation on a 13,800 volt delta system.
Posted Date
Nov 8, 2025
Due Date
Jan 13, 2026
Release: Nov 8, 2025
Close: Jan 13, 2026
4 EA, tr si df 1p 50 13. 8 120/240 - 50kva. Submersible single phase solid insulation distribution transformer designed for 60 hz, 100 degree average winding rise, have 13,800 volt primary, rated 95kv bil, and 240/120 volt 3 wire subtractive polarity secondary rated for 30kv bil or installation on a 13,800 volt delta system.
2 Ea 30/40/50//56.2 MVA transformer, 115-12.47 kV, three phase, 60 Hz, Class ONAN/ONAF/ONAF, 55º/65ºC rise, with open air LV secondary (standard configuration);
Posted Date
Dec 8, 2025
Due Date
Jan 15, 2026
Release: Dec 8, 2025
Close: Jan 15, 2026
2 Ea 30/40/50//56.2 MVA transformer, 115-12.47 kV, three phase, 60 Hz, Class ONAN/ONAF/ONAF, 55º/65ºC rise, with open air LV secondary (standard configuration);
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.