Summary
The project involves replacing the existing HVAC system in the north sector of the student center building. The scope includes decommissioning the old system, installing a new air handling unit with heating and cooling capacity in the west courtyard, and routing new ductwork through the building's exterior wall. The work requires necessary seismic upgrades for code compliance, followed by the restoration of all affected walls, ceilings, and roofing. In addition to the HVAC improvements, the project includes miscellaneous architectural items such as removal of display cases, patch and paint existing walls, adding acoustical tiles, installation of closure to cafeteria serving area.