Summary
Principal items of construction will include: Installation of approx. 7,299 SF of Heavy-Duty concrete; approx. 202 SF of Strempel Road concrete pavement; approx. 283 LF of 2" SCH-80 PVC water line with new 2" tap and service; approx. 359 LF of 6" SDR-26 PVC wastewater line with one (1) new 4' manhole proposed at existing cleanout location, one (1) automatic transfer switch; one(1) Cummins C45N6 45kW natural gas generator a gas service line from meter to back up generator; sidewalk, wheelchair ramps, electrical, landscape and irrigation items; and all other appurtenances necessary for the complete project.