Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The Greeneville Water Commission (Tennessee) is soliciting sealed bids for a Streambank & Channel Stabilization project. Bids are due by 2:00 PM EST on January 15, 2026 at 516 North Main Street in Greeneville, with a mandatory pre‑bid meeting on January 7 at 9:00 AM at the same office before proceeding to the site. Detailed specifications and bid forms will be provided at the mandatory pre‑bid meeting.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
The work in this contract consists of stream bank stabilization and restoration of approximately 900 LF.
Posted Date
Jan 8, 2026
Due Date
Feb 5, 2026
Release: Jan 8, 2026
Close: Feb 5, 2026
The work in this contract consists of stream bank stabilization and restoration of approximately 900 LF.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The project includes stream stabilization along the river to include but not limited to: grading, excavation, and select structure placement to stabilize the eroding stream bank. Structures to be utilized include rock cross vanes, constructed stone riffles, and live stakes. Stream banks and riparian will be planted with native trees, shrubs, and grasses.
Posted Date
Nov 18, 2025
Due Date
Jan 20, 2026
Release: Nov 18, 2025
Close: Jan 20, 2026
The project includes stream stabilization along the river to include but not limited to: grading, excavation, and select structure placement to stabilize the eroding stream bank. Structures to be utilized include rock cross vanes, constructed stone riffles, and live stakes. Stream banks and riparian will be planted with native trees, shrubs, and grasses.
AvailableThe City of Burleson (TX) is soliciting bids for streambank stabilization and sanitary sewer relocation along the south bank of Little Booger Creek. The work includes approximately 400 linear feet of gabion wall and about 300 linear feet of new 24‑inch wastewater main, with service reconnections, manholes, and abandonment of the existing main; the project duration is expected to be 180 calendar days. Bids are due January 29, 2026 at 2:00 PM CST with a virtual pre‑bid on January 14 2026 and a virtual bid opening at 3:00 PM CST on the due date.
Posted Date
Jan 3, 2026
Due Date
Jan 29, 2026
Release: Jan 3, 2026
Close: Jan 29, 2026
The City of Burleson (TX) is soliciting bids for streambank stabilization and sanitary sewer relocation along the south bank of Little Booger Creek. The work includes approximately 400 linear feet of gabion wall and about 300 linear feet of new 24‑inch wastewater main, with service reconnections, manholes, and abandonment of the existing main; the project duration is expected to be 180 calendar days. Bids are due January 29, 2026 at 2:00 PM CST with a virtual pre‑bid on January 14 2026 and a virtual bid opening at 3:00 PM CST on the due date.
AvailableOWASA requests qualifications for professional engineering services to design and permit bank stabilization and potential dredging of the Morgan Creek bypass channel at Mason Farm WWTP. Required work includes hydraulic analysis, floodplain/floodway modeling, erosion assessment, stabilization design, evaluation and design for dredging, permitting (federal/state/local), bid assistance, and construction-phase monitoring. Qualification-based selection; firms must demonstrate experience with channel hydraulic modeling, channel stabilization methods, dredging, and permitting. Submittal: email PDF, letter-size, qualifications limited to 6 pages.
Posted Date
Dec 5, 2025
Due Date
Jan 13, 2026
Release: Dec 5, 2025
Close: Jan 13, 2026
OWASA requests qualifications for professional engineering services to design and permit bank stabilization and potential dredging of the Morgan Creek bypass channel at Mason Farm WWTP. Required work includes hydraulic analysis, floodplain/floodway modeling, erosion assessment, stabilization design, evaluation and design for dredging, permitting (federal/state/local), bid assistance, and construction-phase monitoring. Qualification-based selection; firms must demonstrate experience with channel hydraulic modeling, channel stabilization methods, dredging, and permitting. Submittal: email PDF, letter-size, qualifications limited to 6 pages.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →