Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Contact phone number for this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Lower Platte South Natural Resources District
Erosion repair and bank stabilization. Work at the Site will include: site clearing and installation of sediment controls, sheet pile installation, excavation and fill for bank sloping and subgrade preparation, seeding, installation of turf reinforcement matting, and site restoration.
Posted Date
May 15, 2026
Due Date
Jun 1, 2026
Release: May 15, 2026
Lower Platte South Natural Resources District
Close: Jun 1, 2026
Erosion repair and bank stabilization. Work at the Site will include: site clearing and installation of sediment controls, sheet pile installation, excavation and fill for bank sloping and subgrade preparation, seeding, installation of turf reinforcement matting, and site restoration.
AvailableLower Platte South Natural Resources District
Construction a detention basin that will store high flows diverted slowly release water back into the channel. Includes excavation and hauling of approx. 68,000 CY of earth material, minor fill for embankment, installing a concrete mattress and stilling basin, pipe installation, geoweb soil stabilization, and site amenities. This will require access from right of way, sediment and erosion control, handling of water, and other necessary incidental items.
Posted Date
-
Due Date
May 7, 2026
Lower Platte South Natural Resources District
Close: May 7, 2026
Construction a detention basin that will store high flows diverted slowly release water back into the channel. Includes excavation and hauling of approx. 68,000 CY of earth material, minor fill for embankment, installing a concrete mattress and stilling basin, pipe installation, geoweb soil stabilization, and site amenities. This will require access from right of way, sediment and erosion control, handling of water, and other necessary incidental items.
Lower Platte South Natural Resources District
The work consist of approx 3,400 CY earthwork; 22 LF remove CMP Storm Pipe; 24 LF 48" round equivalent corrugated metal pipe; 166 LF waddles; 4.25 ACRES seeding, fertilizer, and mulch; 8,570 SF erosion blanket; 292 LF bridge railing.
Posted Date
Feb 19, 2026
Due Date
Mar 6, 2026
Release: Feb 19, 2026
Lower Platte South Natural Resources District
Close: Mar 6, 2026
The work consist of approx 3,400 CY earthwork; 22 LF remove CMP Storm Pipe; 24 LF 48" round equivalent corrugated metal pipe; 166 LF waddles; 4.25 ACRES seeding, fertilizer, and mulch; 8,570 SF erosion blanket; 292 LF bridge railing.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Board meetings and strategic plans from Lower Platte South Natural Resources District
The subcommittee discussed and approved a license agreement with Schulz Outdoors LLC regarding temporary structures in a flood pool easement. They recommended the board approve the 2027 operational agreement with the USDA Natural Resources Conservation Service and a staff salary increase for the fiscal year 2027 based on consumer price index data, alongside a merit and salary adjustment pool. The subcommittee also reviewed the internal practice for approving director expense reimbursement reports and discussed a proposed new performance evaluation tool for the general manager.
The Subcommittee discussed and recommended action on several infrastructure and environmental projects, including the Copper Dollar Cove principal spillway pipe repair, the Nebraska Environmental Trust grant contract for the Pecan Creek Wetland Complex, and professional services amendments for the Deadmans Run Flood Reduction Project and the P Street drainage pipe repair. Additionally, the Subcommittee reviewed and recommended awarding the bid for Phase 1 of the Deadmans Run Flood Reduction Project construction.
This Groundwater Management Plan for the Lower Platte South Natural Resources District aims to proactively protect and sustain groundwater resources, ensuring beneficial use in conformance with state standards. The plan outlines goals and objectives for both groundwater quantity and quality, focusing on monitoring elevations and contamination, preventing pollution, and encouraging sustainable development. It details management strategies, including non-regulatory approaches like public education and voluntary practices, alongside regulatory authorities to address issues such as nitrate contamination, total dissolved solids, emerging contaminants, and quantity concerns arising from geology, climate, and water use.
The subcommittee considered several action items including a Recreational Trails Program grant agreement with the Nebraska Game and Parks Commission for the Kolbrook segment of the Prairie Corridor Trail and an amendment to the agreement with JEO Consulting for additional project management and environmental services. The committee also reviewed bids for boundary fence replacements on four saline wetland properties and considered a license agreement for an agricultural crossing on the Homestead Trail. Additionally, staff provided updates on the upcoming LRIP meeting and grant funding opportunities.
The Finance and Planning Subcommittee discussed and approved the proposed schedule for the development of the FY2027 Long-Range Implementation Plan and the associated budget process. Additionally, the committee approved recommendations for the Board of Directors regarding budget overruns exceeding the 20% threshold for bank services and director and staff liability insurance, with the associated costs to be covered by cash reserves.
Extracted from official board minutes, strategic plans, and video transcripts.
Track Lower Platte South Natural Resources District's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Decision Makers
Communications Coordinator / Adult Environmental Educator
Premium
Access the largest public sector contact database
© 2026 Starbridge