Pine-Strawberry Fire District
Work consist of 3 replacement well with a submersible pump and motor, prefabricated well enclosure and booster pump station building construction, installation of a pre-packaged booster pump skid, construction of a 100,000 gal tank, DI wellhead piping, 4" C900 buried site piping, waterline connection to existing waterline; see outside link.
Release
Sep 11, 2024
Close
Oct 24, 2024