Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Boiler replacement.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Remove and dispose of the existing boiler system in Building 101, including associated piping, venting, and electrical components no longer required. Minimum input of 285,000 BTU/hr and ≥96% thermal efficiency and at least 100 gallons of storage.
Posted Date
Nov 10, 2025
Due Date
Dec 11, 2025
Release: Nov 10, 2025
Close: Dec 11, 2025
Remove and dispose of the existing boiler system in Building 101, including associated piping, venting, and electrical components no longer required. Minimum input of 285,000 BTU/hr and ≥96% thermal efficiency and at least 100 gallons of storage.
Premium
Access the largest public sector contact database
Seeking separate turnkey design and cost proposal for the boiler replacement epdm roof building automation systems - ddc controls replacement.
Posted Date
Dec 7, 2025
Due Date
Dec 29, 2025
Release: Dec 7, 2025
Close: Dec 29, 2025
Seeking separate turnkey design and cost proposal for the boiler replacement epdm roof building automation systems - ddc controls replacement.
AvailableWork includes to replace up to four (4) industrial boilers. Two boilers are in the lab building and two are in the sludge dewatering building. The work includes the removal and proper disposal of existing boilers and the supply, installation, and integration of new high-efficiency, natural gas-fired boilers with the existing heating systems in both buildings.
Posted Date
Nov 14, 2025
Due Date
Dec 16, 2025
Release: Nov 14, 2025
Close: Dec 16, 2025
Work includes to replace up to four (4) industrial boilers. Two boilers are in the lab building and two are in the sludge dewatering building. The work includes the removal and proper disposal of existing boilers and the supply, installation, and integration of new high-efficiency, natural gas-fired boilers with the existing heating systems in both buildings.
AvailableProvide boiler replacement.
Posted Date
Dec 8, 2025
Due Date
Jan 5, 2026
Release: Dec 8, 2025
Close: Jan 5, 2026
Provide boiler replacement.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis