Logo

starbridge

Book a Demo
RFPs/Stormwater Resiliency - Hwy 13 -Cemetery (22-603)

Stormwater Resiliency - Hwy 13 -Cemetery (22-603)

City of Burnsville

Summary

Work includes 31,644 CY Common Excavation, 1,576  CY Common Embankment (Clay), 362 LF 12” RC Pipe Sewer CES 3006, 52 LF 18” RC Pipe Sewer CES 3006, 65 LF 30” RC Pipe Sewer CES 3006, 164 LF 36” RC Pipe Sewer CES 3006, 140 CY Aggregate Base, Class 5, 138 SY Articulated Concrete Block Mat, 750 CY Random Riprap, Class IV, 3,400 LF Sediment Control Log, 1,830 CY Common Topsoil Borrow, 1 EA Chain Link Vehicular Gate, 40 LF Chain Link Fence, 44  LB Seed Mixture 25-131, 11 LB Seed Mixture 33-261, 112 LB Seed Mixture 35-221, 49 LF Drainage Structure, Des F, 48”, 12 LF Drainage Structure, Des F, 60”, 7 LF Drainage Structure, Des F, 84”, 10 LF  Drainage Structure, Des F, 96”, 76 SY Remove Bituminous Pavement.

Files

No files

Details

Release

Jan 02, 2025

Close

Jan 23, 2025

Contacts

Source