Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The City of Florissant (St. Louis County, MO) is soliciting bids to construct approximately 300 linear feet of storm sewer, install two curb inlet manholes and one curb inlet, and perform related ADA-compliant sidewalk and site restoration work to address chronic flooding at Lindsay Ln & Florisota Dr. Bidders must submit proposals through the OpenGov e-Procurement Portal and comply with applicable insurance, bonding, prevailing wage, safety training, and certification requirements.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Removal of approximately 92 LF of two 35"x24" arch-corrugated metal pipes (CMP) and the surrounding pavement. The Project includes the installation of two new 34"x53" elliptical reinforced concrete pipes (RCP), one being 67 LF and one being 73 LF, as well as two new concrete headwalls. Approximately 166 LF of guardrail will also be installed. The road will be restored after the new culvert is installed.
Posted Date
Dec 10, 2025
Due Date
Jan 14, 2026
Release: Dec 10, 2025
Close: Jan 14, 2026
Removal of approximately 92 LF of two 35"x24" arch-corrugated metal pipes (CMP) and the surrounding pavement. The Project includes the installation of two new 34"x53" elliptical reinforced concrete pipes (RCP), one being 67 LF and one being 73 LF, as well as two new concrete headwalls. Approximately 166 LF of guardrail will also be installed. The road will be restored after the new culvert is installed.
Premium
Access the largest public sector contact database
Work includes roadway improvements, stormwater improvements that include two separate exfiltration systems, existing sheet pile weir in the stormwater treatment area no. 1 and includes adding a baffle box at outfall no. 1, portable generator to be located to service the existing and future back-up pump systems.
Posted Date
Nov 18, 2025
Due Date
Dec 17, 2025
Release: Nov 18, 2025
Close: Dec 17, 2025
Work includes roadway improvements, stormwater improvements that include two separate exfiltration systems, existing sheet pile weir in the stormwater treatment area no. 1 and includes adding a baffle box at outfall no. 1, portable generator to be located to service the existing and future back-up pump systems.
AvailablePark and stormwater improvement. Install bioretention cell, stormwater wetland, pervious pavers, and improvements to existing swales and vegetation to reduce runoff and improve water quality and biodiversity in the Beaverdam Creek watershed. Construct a new concrete parking lot and walking path to improve park access and aesthetics.
Posted Date
Nov 14, 2025
Due Date
Dec 15, 2025
Release: Nov 14, 2025
Close: Dec 15, 2025
Park and stormwater improvement. Install bioretention cell, stormwater wetland, pervious pavers, and improvements to existing swales and vegetation to reduce runoff and improve water quality and biodiversity in the Beaverdam Creek watershed. Construct a new concrete parking lot and walking path to improve park access and aesthetics.
AvailableProvide stormwater management to over 1-acre of impervious surface. In addition to the stormwater planters, the project will include benches, depaving, new piping to a street manhole, and disconnecting a roof downspout and routing that runoff to a new stormwater planter to further lessen the school's stormwater contribution to the city's combined stormwater sewer system.
Posted Date
Nov 20, 2025
Due Date
Jan 16, 2026
Release: Nov 20, 2025
Close: Jan 16, 2026
Provide stormwater management to over 1-acre of impervious surface. In addition to the stormwater planters, the project will include benches, depaving, new piping to a street manhole, and disconnecting a roof downspout and routing that runoff to a new stormwater planter to further lessen the school's stormwater contribution to the city's combined stormwater sewer system.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis