Discover Opportunities months before the RFP drops
Learn more βRetrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Greenville County
Park and stormwater improvement. Install bioretention cell, stormwater wetland, pervious pavers, and improvements to existing swales and vegetation to reduce runoff and improve water quality and biodiversity in the Beaverdam Creek watershed. Construct a new concrete parking lot and walking path to improve park access and aesthetics.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs β target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Greenville County
Work consist of 11,386 SY of resurfacing asphalt parking lots, 4,800 CY excavation & stockpiling, 260 CY of filter media, 30 CY of riprap, 1,620 CY of no. 57 stone (washed), 20 CY of no. 789 stone (washed), 2,270 CY of no. 2 stone (washed), 292 LF of new 15" RCP, 1,800 SY of coir turf reinforcement matting 700g, 6,050 LF of ribbon curbing (pervious pavers), 1,836 SY of pervious pavers, vegetation establishment: park turf mix, 1,385 EA of grasses (plugs), 80 lf of 4" PVC perforated underdrain & fittings, 100 LF of 4" pvc underdrain & fittings, 120 LF of bioretention level spreader, 1,283 SY of new asphalt parking, 4,856 SY of cmrb main drive. See attached file.
Posted Date
Oct 31, 2025
Due Date
Dec 2, 2025
Release: Oct 31, 2025
Greenville County
Close: Dec 2, 2025
Work consist of 11,386 SY of resurfacing asphalt parking lots, 4,800 CY excavation & stockpiling, 260 CY of filter media, 30 CY of riprap, 1,620 CY of no. 57 stone (washed), 20 CY of no. 789 stone (washed), 2,270 CY of no. 2 stone (washed), 292 LF of new 15" RCP, 1,800 SY of coir turf reinforcement matting 700g, 6,050 LF of ribbon curbing (pervious pavers), 1,836 SY of pervious pavers, vegetation establishment: park turf mix, 1,385 EA of grasses (plugs), 80 lf of 4" PVC perforated underdrain & fittings, 100 LF of 4" pvc underdrain & fittings, 120 LF of bioretention level spreader, 1,283 SY of new asphalt parking, 4,856 SY of cmrb main drive. See attached file.
AvailableCity of Falls Church
Provide stormwater drainage improvements project.
Posted Date
Oct 29, 2025
Due Date
Dec 4, 2025
Release: Oct 29, 2025
City of Falls Church
Close: Dec 4, 2025
Provide stormwater drainage improvements project.
AvailableDouglasville-Douglas County Water And Sewer Authority
Removal of approx. 84 LF of 48" corrugated metal pipe (CMP), two headwalls, and 51 LF of 8" water main. The Project includes installation of 47 LF of 12'x8' concrete box culvert, two concrete headwalls, 51 LF of 8" ductile iron water main pipe and associated road restoration.
Posted Date
Nov 12, 2025
Due Date
Dec 10, 2025
Release: Nov 12, 2025
Douglasville-Douglas County Water And Sewer Authority
Close: Dec 10, 2025
Removal of approx. 84 LF of 48" corrugated metal pipe (CMP), two headwalls, and 51 LF of 8" water main. The Project includes installation of 47 LF of 12'x8' concrete box culvert, two concrete headwalls, 51 LF of 8" ductile iron water main pipe and associated road restoration.
AvailableBorough of Plum
The project will include: 200 lf of 24 SLCPP storm sewer installation, 260 lf of 18 SLCPP storm sewer installation, slope stabilization, stormwater inlet and manhole installation, manhole grouting and restoration, e&s control installation, landscaping and asphalt restoration.
Posted Date
Nov 7, 2025
Due Date
Nov 24, 2025
Release: Nov 7, 2025
Borough of Plum
Close: Nov 24, 2025
The project will include: 200 lf of 24 SLCPP storm sewer installation, 260 lf of 18 SLCPP storm sewer installation, slope stabilization, stormwater inlet and manhole installation, manhole grouting and restoration, e&s control installation, landscaping and asphalt restoration.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo βVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis