Discover Opportunities months before the RFP drops
Learn more βRetrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Greenville County
Work consist of 11,386 SY of resurfacing asphalt parking lots, 4,800 CY excavation & stockpiling, 260 CY of filter media, 30 CY of riprap, 1,620 CY of no. 57 stone (washed), 20 CY of no. 789 stone (washed), 2,270 CY of no. 2 stone (washed), 292 LF of new 15" RCP, 1,800 SY of coir turf reinforcement matting 700g, 6,050 LF of ribbon curbing (pervious pavers), 1,836 SY of pervious pavers, vegetation establishment: park turf mix, 1,385 EA of grasses (plugs), 80 lf of 4" PVC perforated underdrain & fittings, 100 LF of 4" pvc underdrain & fittings, 120 LF of bioretention level spreader, 1,283 SY of new asphalt parking, 4,856 SY of cmrb main drive. See attached file.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs β target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Greenville County
Park and stormwater improvement. Install bioretention cell, stormwater wetland, pervious pavers, and improvements to existing swales and vegetation to reduce runoff and improve water quality and biodiversity in the Beaverdam Creek watershed. Construct a new concrete parking lot and walking path to improve park access and aesthetics.
Posted Date
Nov 14, 2025
Due Date
Dec 15, 2025
Release: Nov 14, 2025
Greenville County
Close: Dec 15, 2025
Park and stormwater improvement. Install bioretention cell, stormwater wetland, pervious pavers, and improvements to existing swales and vegetation to reduce runoff and improve water quality and biodiversity in the Beaverdam Creek watershed. Construct a new concrete parking lot and walking path to improve park access and aesthetics.
AvailableCity of Dublin
Construction of the park place stormwater basin improvements project. The project includes edge treatment improvements to the Park Place stormwater management basin north of Monticello Lane to address areas of erosion. The project will re-establish the aquatic bench along the perimeter of the basin due to the normal pool being lowered by 19" to alleviate an upstream stormwater management deficiency. Additionally, the project will improvement the basin edge aesthetic that resulted in lowering the normal pool by 19".
Posted Date
Oct 29, 2025
Due Date
Nov 19, 2025
Release: Oct 29, 2025
City of Dublin
Close: Nov 19, 2025
Construction of the park place stormwater basin improvements project. The project includes edge treatment improvements to the Park Place stormwater management basin north of Monticello Lane to address areas of erosion. The project will re-establish the aquatic bench along the perimeter of the basin due to the normal pool being lowered by 19" to alleviate an upstream stormwater management deficiency. Additionally, the project will improvement the basin edge aesthetic that resulted in lowering the normal pool by 19".
Borough of Plum
The project will include: 200 lf of 24 SLCPP storm sewer installation, 260 lf of 18 SLCPP storm sewer installation, slope stabilization, stormwater inlet and manhole installation, manhole grouting and restoration, e&s control installation, landscaping and asphalt restoration.
Posted Date
Nov 7, 2025
Due Date
Nov 24, 2025
Release: Nov 7, 2025
Borough of Plum
Close: Nov 24, 2025
The project will include: 200 lf of 24 SLCPP storm sewer installation, 260 lf of 18 SLCPP storm sewer installation, slope stabilization, stormwater inlet and manhole installation, manhole grouting and restoration, e&s control installation, landscaping and asphalt restoration.
AvailableCity of Lake Worth Beach
Storm water improvement.
Posted Date
Oct 26, 2025
Due Date
Nov 25, 2025
Release: Oct 26, 2025
City of Lake Worth Beach
Close: Nov 25, 2025
Storm water improvement.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo βVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis