Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes 15,800 LF of 30" concrete storm sewer; 2.7 miles of full road reconstruction; site and ecological improvements at detention basin; Expansion of existing detention basin; new parking lot at detention basin; 1,110 LF of steel sheet pile wall.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
work includes the construction of a grassed waterway, storm sewer connections, and miscellaneous drainage improvements for the Ringgenberg Farm.
Posted Date
Nov 18, 2025
Due Date
Dec 16, 2025
Release: Nov 18, 2025
Close: Dec 16, 2025
work includes the construction of a grassed waterway, storm sewer connections, and miscellaneous drainage improvements for the Ringgenberg Farm.
AvailablePremium
Access the largest public sector contact database
The solicitation seeks contractors to construct a grassed waterway, install storm sewer connections, and complete miscellaneous drainage improvements at Ringgenberg Farm to improve storm water management. Proposals are due by Dec 16, 2025 and contractors should obtain solicitation documents from the buyer's site (BidExpress) before submitting.
Posted Date
-
Due Date
Dec 16, 2025
Close: Dec 16, 2025
The solicitation seeks contractors to construct a grassed waterway, install storm sewer connections, and complete miscellaneous drainage improvements at Ringgenberg Farm to improve storm water management. Proposals are due by Dec 16, 2025 and contractors should obtain solicitation documents from the buyer's site (BidExpress) before submitting.
AvailableProject consists of water system improvements.
Posted Date
Nov 30, 2025
Due Date
Dec 19, 2025
Release: Nov 30, 2025
Close: Dec 19, 2025
Project consists of water system improvements.
AvailableIn general, the work consists of: removing the existing sidewalk and retaining wall, constructing a new concrete retaining wall, replacing the sidewalk, installing a storm inlet and trench drain, and regrading the disturbed area and restoration of disturbed area on the west side of Fricker Hall.
Posted Date
Nov 11, 2025
Due Date
Dec 17, 2025
Release: Nov 11, 2025
Close: Dec 17, 2025
In general, the work consists of: removing the existing sidewalk and retaining wall, constructing a new concrete retaining wall, replacing the sidewalk, installing a storm inlet and trench drain, and regrading the disturbed area and restoration of disturbed area on the west side of Fricker Hall.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis