Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
This RFP is for general contractors to install a 36-inch RCP storm drain pipe using the jack and bore method under Union Pacific railroad tracks, including other storm drain structures.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Procurement of services for the installation of a 36-inch RCP storm drain pipe using the jack and bore method under Union Pacific railroad tracks and other storm drain structures at 1325 West.
Posted Date
-
Due Date
Jan 15, 2026
Close: Jan 15, 2026
Procurement of services for the installation of a 36-inch RCP storm drain pipe using the jack and bore method under Union Pacific railroad tracks and other storm drain structures at 1325 West.
AvailableRelease: Dec 17, 2025
Close: Jan 12, 2026
Lining of storm drain.
AvailableWork includes railroad crossing improvements.
Posted Date
Dec 12, 2025
Due Date
Jan 7, 2026
Release: Dec 12, 2025
Close: Jan 7, 2026
Work includes railroad crossing improvements.
AvailableProject consists of approx. 475 LF of asphalt pavement replacement removal and replacement at a BNSF railroad crossing. Also included in the project is the placement of two 36" RCP culverts with headwalls, approxi. 5,950 SY of asphalt pavement spot repairs, surface treatment, and re-striping of 5,870 LF of asphalt pavement along Glendenning Parkway.
Posted Date
Dec 5, 2025
Due Date
Jan 8, 2026
Release: Dec 5, 2025
Close: Jan 8, 2026
Project consists of approx. 475 LF of asphalt pavement replacement removal and replacement at a BNSF railroad crossing. Also included in the project is the placement of two 36" RCP culverts with headwalls, approxi. 5,950 SY of asphalt pavement spot repairs, surface treatment, and re-striping of 5,870 LF of asphalt pavement along Glendenning Parkway.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis