Richland-Bean Blossom Community School District
School DistrictIN
-
Closes
Aug 6, 2026
Richland Bean Blossom Edgewood Schools High School Addition & Renovation Jr High Addition & Renovation RFP
Schools addition & renovation project.
Description: Storage garage addition: bid package 1 - earthwork; bid package 2 - site utilities; bid package 3 - paving; bid package 4 - poured-in-place concrete; bid package 5 - general construction; bid package 6 - plumbing; bid package 7 - mechanical; bid package 8 - electrical; bid package 9 - data and low voltage.
SchoolDistrict · IL, US
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalAdjacent opportunities open for bidding right now.
Richland-Bean Blossom Community School District
School DistrictIN
-
Closes
Aug 6, 2026
Schools addition & renovation project.
CityAK
Jul 17, 2026
Closes
Aug 20, 2026
Project consists of the construction of an approximately 4,400 square foot pre-engineered metal building.
Jackson County Memorial Hospital
Special DistrictOK
Jul 14, 2026
Closes
Aug 11, 2026
Work includes concrete and masonry; steel fabrication; structural steel erection; millwork; general trades; thermal and moisture protection; hollow metal frames wood doors; door hardware; aluminum storefront and glazing; framing, drywall, insulation & ceiling systems; flooring and tiling; tape, bed, & painting; fire suppression; mechanical; electrical; fire alarm; site pavements and walks; special construction.
Richland-Bean Blossom Community School District
School DistrictIN
-
Closes
Aug 6, 2026
Schools addition & renovation project.
Procurement and program contacts connected to Lansing School District 158.