FederalDC
Jul 21, 2026
Closes
Aug 7, 2026
Black Creek Trail Restoration Project - DE Soto Rd - MS
29 mi, trail restoration.
Description: Huron-Clinton Metropolitan Authority is seeking bids for restoration work involving the Trolley Trails and Landscape Trail at Stony Creek Metropark in Michigan. The opportunity was published on August 3, 2026, and submissions are due August 25, 2026 at 1:00 p.m. EDT. This is a construction solicitation rather than a grant program, and the buyer directs vendors to its current construction bid opportunities page.
SpecialDistrict · MI, US
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalAdjacent opportunities open for bidding right now.
FederalDC
Jul 21, 2026
Closes
Aug 7, 2026
29 mi, trail restoration.
CityCA
Jul 2, 2026
Closes
Aug 12, 2026
Work consists of improvements structural stabilization, roof replacement, mitigation of tree-related impacts, and other necessary rehabilitation measures designed to preserve the historic integrity and character of both buildings.
CityAR
Jul 26, 2026
Closes
Aug 18, 2026
Work includes streambank stabilization and restoration. Major work includes clearing and grubbing, excavation and grading, and installation of streambank protection measures such as rock revetments, cross vane structures, and in-stream boulder placements. Additional work includes implementation of temporary and permanent erosion control measures, site restoration. Description: 1 LS of mobilization, bonding, insurance; 1 LS of erosion control maintenance; 725 LF of tree preservation fencing; 2 ea of construction entrance; 1 LS of construction staking; 1 LS of removal of manmade materials from streambed and clearing and grubbing; 1 LS of trail protection matting or detour routing materials and signage; 630 CY of temporary diversion berm & channel - excavation and removal. See attached file.
Jun 30, 2026
Closes
Aug 18, 2026
Work includes site clearing, sediment removal, grading of the streambanks, streambank stabilization, installation of retaining walls, installation of permanent 100% biodegradable stabilization matting, landscaping, erosion and sediment controls, mill & overlay, guiderail replacement, base repairs, and pavement resurfacing as required to complete the proposed improvements.
Procurement and program contacts connected to Huron-Clinton Metropolitan Authority.