Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Provide interceptor CIPP relining and manhole rehabilitation work. Major quantities include: 2,750 LF of 12" CIPP, 2,800 LF of 15" CIPP, 1,600 LF of 18" CIPP, 2,300 LF of 20" CIPP, 12,300 LF of 30" CIPP and 3,200 LF of 42" CIPP.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Perform on-call ultra-violet cured-in-place pipe (UV-CIPP) lining as well as contractors to perform manhole rehabilitation via the application of 100% solids epoxy coating.
Posted Date
Dec 12, 2025
Due Date
Jan 30, 2026
Release: Dec 12, 2025
Close: Jan 30, 2026
Perform on-call ultra-violet cured-in-place pipe (UV-CIPP) lining as well as contractors to perform manhole rehabilitation via the application of 100% solids epoxy coating.
AvailableApprox. 2,867 LF of 8" pipe cleaning, 3,324 LF of 10" pipe cleaning, 27 protruding service removals, 2867 LF of 8" CIPP, 3324 LF of 10" CIPP, 121 building service reconnections, and miscellaneous related work and appurtenances.
Posted Date
Dec 19, 2025
Due Date
Feb 10, 2026
Release: Dec 19, 2025
Close: Feb 10, 2026
Approx. 2,867 LF of 8" pipe cleaning, 3,324 LF of 10" pipe cleaning, 27 protruding service removals, 2867 LF of 8" CIPP, 3324 LF of 10" CIPP, 121 building service reconnections, and miscellaneous related work and appurtenances.
AvailableWork includes removal and replacement of three (3) existing sanitary sewer interceptor manholes located in tidally influenced areas. Work includes demolition and removal of existing manholes; installation of new armorock polymer concrete manholes; connection to existing sewer piping; project dewatering; high-volume, large-diameter temporary bypass pumping to maintain continuous sanitary sewer service; protection of existing structures and utilities; required permitting; utility coordination and relocation as necessary; and restoration of all disturbed areas.
Posted Date
Jan 7, 2026
Due Date
Feb 10, 2026
Release: Jan 7, 2026
Close: Feb 10, 2026
Work includes removal and replacement of three (3) existing sanitary sewer interceptor manholes located in tidally influenced areas. Work includes demolition and removal of existing manholes; installation of new armorock polymer concrete manholes; connection to existing sewer piping; project dewatering; high-volume, large-diameter temporary bypass pumping to maintain continuous sanitary sewer service; protection of existing structures and utilities; required permitting; utility coordination and relocation as necessary; and restoration of all disturbed areas.
AvailableWork includes sewer cured in place rehabilitation project shall include, but not be limited to, obtaining a encroachment permits from the city, providing traffic control, public notifications, cleaning of sewer lines prior to insertion of cured in place pipe resin impregnated flexible liner, cleaning of manholes prior to rehabilitation of the manhole by lining, inspection of pipelines via closed circuit television before and after liner pipe installation, bypassing manholes, bypass pumping and/or diversion of sewage flows, reconnecting service laterals and cleanup.
Posted Date
Dec 23, 2025
Due Date
Feb 6, 2026
Release: Dec 23, 2025
Close: Feb 6, 2026
Work includes sewer cured in place rehabilitation project shall include, but not be limited to, obtaining a encroachment permits from the city, providing traffic control, public notifications, cleaning of sewer lines prior to insertion of cured in place pipe resin impregnated flexible liner, cleaning of manholes prior to rehabilitation of the manhole by lining, inspection of pipelines via closed circuit television before and after liner pipe installation, bypassing manholes, bypass pumping and/or diversion of sewage flows, reconnecting service laterals and cleanup.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis