Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The City of Roseville seeks a contractor to rehabilitate approximately 1,427 linear feet of existing 54‑inch corrugated metal storm drain pipe near Stoney Point Way and Jamestown Drive using a concrete spray‑applied liner. The project also includes rehabilitation of two manhole bases and must comply with the City’s standard construction specifications. All communications and bidding occur through Public Purchase, with questions due by February 17, 2026 and bids due by February 24, 2026.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes 100 CY exploratory excavation; 50 CY earth excavation and refill below normal depth; 50 CY rock excavation (minimum); 250 LF furnish and install (8 to 12)-inch hdpe drain pipe, all depths; 150 LF furnish and install (15 to 21)-inch hdpe or concrete drain pipe, all depths; 5 EA furnish and install brick and mortar plug in pipe larger than 8" diameter; 6 VF install new 5-foot diameter drain manhole; 45 VF install new 4-foot diameter catch basin or manhole; 10 VF reconstruct sewer or drain structures; 325 v 2" temporary bituminous concrete pavement; 500 SY 4" permanent bituminous concrete pavement in trenches; 40 LF remove and reset granite curb; 11 EA furnish, install, maintain, and remove silt sack in catchbasins. See attached files.
Posted Date
Jan 20, 2026
Due Date
Feb 4, 2026
Release: Jan 20, 2026
Close: Feb 4, 2026
Work includes 100 CY exploratory excavation; 50 CY earth excavation and refill below normal depth; 50 CY rock excavation (minimum); 250 LF furnish and install (8 to 12)-inch hdpe drain pipe, all depths; 150 LF furnish and install (15 to 21)-inch hdpe or concrete drain pipe, all depths; 5 EA furnish and install brick and mortar plug in pipe larger than 8" diameter; 6 VF install new 5-foot diameter drain manhole; 45 VF install new 4-foot diameter catch basin or manhole; 10 VF reconstruct sewer or drain structures; 325 v 2" temporary bituminous concrete pavement; 500 SY 4" permanent bituminous concrete pavement in trenches; 40 LF remove and reset granite curb; 11 EA furnish, install, maintain, and remove silt sack in catchbasins. See attached files.
AvailableProcurement of construction services for the removal and disposal of an existing fishing pier, including related structures and utilities, and site repair, for the Sunset Point Fishing Pier, Handicap Pier, and Site Repair Project.
Posted Date
Jan 21, 2026
Due Date
Feb 25, 2026
Release: Jan 21, 2026
Close: Feb 25, 2026
Procurement of construction services for the removal and disposal of an existing fishing pier, including related structures and utilities, and site repair, for the Sunset Point Fishing Pier, Handicap Pier, and Site Repair Project.
AvailableProcurement of services for roadway repair and resurfacing, including milling, patching, asphalt application, manhole and water valve adjustments, traffic signal loop installation, and striping for Paving the Way Project 5.
Posted Date
Jan 21, 2026
Due Date
Feb 26, 2026
Release: Jan 21, 2026
Close: Feb 26, 2026
Procurement of services for roadway repair and resurfacing, including milling, patching, asphalt application, manhole and water valve adjustments, traffic signal loop installation, and striping for Paving the Way Project 5.
AvailableDrainage and roadway improvement project.
Posted Date
Dec 4, 2025
Due Date
Feb 10, 2026
Release: Dec 4, 2025
Close: Feb 10, 2026
Drainage and roadway improvement project.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →