Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes 100 CY exploratory excavation; 50 CY earth excavation and refill below normal depth; 50 CY rock excavation (minimum); 250 LF furnish and install (8 to 12)-inch hdpe drain pipe, all depths; 150 LF furnish and install (15 to 21)-inch hdpe or concrete drain pipe, all depths; 5 EA furnish and install brick and mortar plug in pipe larger than 8" diameter; 6 VF install new 5-foot diameter drain manhole; 45 VF install new 4-foot diameter catch basin or manhole; 10 VF reconstruct sewer or drain structures; 325 v 2" temporary bituminous concrete pavement; 500 SY 4" permanent bituminous concrete pavement in trenches; 40 LF remove and reset granite curb; 11 EA furnish, install, maintain, and remove silt sack in catchbasins. See attached files.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Design/build services for trail drainage improvement project.
Posted Date
Dec 5, 2025
Due Date
Jan 29, 2026
Release: Dec 5, 2025
Close: Jan 29, 2026
Design/build services for trail drainage improvement project.
AvailableStorm drainage improvement project involves removal of existing retaining wall and installation of erosion control measures; installation of a new retaining wall; milling, resurfacing, and restriping of existing parking lot; installation of wheelstops and installation of curb; installation of a stormwater manhole, catch basin, and associated pipe. Stream improvements include addition a boulder toe, rock sills, and plantings along portions of the stream.
Posted Date
Jan 20, 2026
Due Date
Feb 18, 2026
Release: Jan 20, 2026
Close: Feb 18, 2026
Storm drainage improvement project involves removal of existing retaining wall and installation of erosion control measures; installation of a new retaining wall; milling, resurfacing, and restriping of existing parking lot; installation of wheelstops and installation of curb; installation of a stormwater manhole, catch basin, and associated pipe. Stream improvements include addition a boulder toe, rock sills, and plantings along portions of the stream.
The City of Miami Springs seeks a qualified contractor to construct the South Drive Stormwater and Roadway Improvement Project to provide water quality, stormwater management, and beautification along the South Drive corridor. The scope includes localized drainage, roadway geometry and landscape improvements, enhancements to roundabouts, and measures to accommodate pedestrian, cyclist, and motorist safety while reducing flooding. This opportunity is issued as an Invitation for Bid (ITB) and includes a mandatory pre-bid meeting; supporting bid documents are available on the original posting linked from the aggregator.
Posted Date
Dec 4, 2025
Due Date
Jan 27, 2026
Release: Dec 4, 2025
Close: Jan 27, 2026
The City of Miami Springs seeks a qualified contractor to construct the South Drive Stormwater and Roadway Improvement Project to provide water quality, stormwater management, and beautification along the South Drive corridor. The scope includes localized drainage, roadway geometry and landscape improvements, enhancements to roundabouts, and measures to accommodate pedestrian, cyclist, and motorist safety while reducing flooding. This opportunity is issued as an Invitation for Bid (ITB) and includes a mandatory pre-bid meeting; supporting bid documents are available on the original posting linked from the aggregator.
This project area is within a drainage area of approx 300 acres and the improvements will include culvert and pipe system upgrades.
Posted Date
Dec 30, 2025
Due Date
Jan 21, 2026
Release: Dec 30, 2025
Close: Jan 21, 2026
This project area is within a drainage area of approx 300 acres and the improvements will include culvert and pipe system upgrades.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis