Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Retrofitting of four stormwater detention basins and approx. 1,750 LF of paved walking trail.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Request for Proposal for engineering and design services, including bid cycle and construction engineering and inspection services, for sea level rise mitigation measures on the east side of the Goose River in Rockport Harbor.
Posted Date
Jan 9, 2026
Due Date
Feb 6, 2026
Release: Jan 9, 2026
Close: Feb 6, 2026
Request for Proposal for engineering and design services, including bid cycle and construction engineering and inspection services, for sea level rise mitigation measures on the east side of the Goose River in Rockport Harbor.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The "Cheney HVAC System Rebid Project" is an open Invitation to Bid (ITB) issued by the Park District of Oak Park, Illinois. The project involves the full installation of HVAC equipment, ductwork, electrical work, and existing geothermal well manifold hookups and components, with a Base Bid and two Alternates. A non-mandatory pre-bid walk-thru is scheduled for January 9th, 2026, and bids are due by January 28th, 2026.
Posted Date
Dec 29, 2025
Due Date
Jan 28, 2026
Release: Dec 29, 2025
Close: Jan 28, 2026
The "Cheney HVAC System Rebid Project" is an open Invitation to Bid (ITB) issued by the Park District of Oak Park, Illinois. The project involves the full installation of HVAC equipment, ductwork, electrical work, and existing geothermal well manifold hookups and components, with a Base Bid and two Alternates. A non-mandatory pre-bid walk-thru is scheduled for January 9th, 2026, and bids are due by January 28th, 2026.
AvailableThe County of Sacramento (Sacramento County Department of Transportation) issued an RFP to develop a Wilton Area Resilience Improvement Plan and prepare 30% preliminary design plans and cost estimates to improve roadway resiliency to flooding and wildfires along the Cosumnes River. The consultant will perform project management, public outreach, preliminary design (30% conceptual plans), and cost estimating; the work coordinates with Caltrans and other stakeholders and evaluates multi-modal options. The contract performance period is 18 months from execution.
Posted Date
Jan 16, 2026
Due Date
Feb 19, 2026
Release: Jan 16, 2026
Close: Feb 19, 2026
The County of Sacramento (Sacramento County Department of Transportation) issued an RFP to develop a Wilton Area Resilience Improvement Plan and prepare 30% preliminary design plans and cost estimates to improve roadway resiliency to flooding and wildfires along the Cosumnes River. The consultant will perform project management, public outreach, preliminary design (30% conceptual plans), and cost estimating; the work coordinates with Caltrans and other stakeholders and evaluates multi-modal options. The contract performance period is 18 months from execution.
AvailableRelease: Aug 19, 2025
Close: Feb 18, 2026
Provide park phase 1 site improvement.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →