I-80 Interchange - Northwest, Project C-77 (26-26) (Request For Proposal)
Work includes 3,000 LF install silt fence; 28 E install inlet protection; 2 EA install concrete washout; 1,500 LF install wattle; 1 LS clearing and grubbing general' 39 LF remove 18" or smaller culvert pipe; 118 LF remove 72" culvert pipe; 50 LF remove 15" to 18" sewer pipe; 163 LF remove 21" to 24" sewer pipe; 22 LF remove 36" sewer pipe; 3 ea remove manhole; 5 EA remove curb inlet; 1 EA remove area inlet; 2 ea remove flared end section (less than 24"); 2 EA remove and salvage 96" flared end section; 2 EA remove 24" pipe plug; 7,900 lf remove pavement markings; 7 EA remove and salvage sign.