Summary
The contractor is to complete all work shown in the plans, with the exception of asphalt paving. Work that is the responsibility of the contractor includes, but is not limited to, demolition, rough and finish grading, curb and gutter, concrete flatwork, utility adjustments, and installation of the Rain Guardian. All asphalt paving will be performed by others. The contractor is to leave the parking lot in a condition, and elevation, suitable for paving. Any required small touch-up grading will be completed by others prior to paving. All disturbed areas to be held-down 6" to allow for installation of topsoil.