Work includes removal of two dual-fuel (gas and #2 fuel oil) domestic hot water tanks and associated valves, fittings, and appurtenances in the Academic Building 1 boiler room. The removal includes all the associated piping for the cold water, domestic water, hot water supply, gas, fuel oil, breeching, and drains. The removal of all electrical wiring and conduits from the equipment. The removal of three circulating pumps, an existing mixing valve, and associated piping. Partial removal of the existing shaft from the basement to the 6th floor to allow for the installation of 3” city water and domestic hot water piping. Remove a section of the existing roof to install new heat pumps and pipe penetrations.