FederalDC
Posted
Sep 20, 2026
Oct 20, 2026
SR Power Supplies Rack Detailed Design for ALS-U
The RFP seeks a firm-fixed-price detailed engineering design for the Advanced Light Source Upgrade (ALS-U) storage-ring power-supply rack assemblies, covering 16 rack families and 76 total racks. Required work includes 3-D mechanical models, production drawings, electrical schematics, bus-bar documentation, and cable-harness designs, with submissions for Preliminary and Final Design Reviews. The contractor must provide quality-controlled documentation and up to 200 hours of post-design support, and deliver the final design package by January 31, 2027.
