Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Confederated Salish and Kootenai Tribes of the Flathead Reservation
Construction of a cement-bentonite slurry cutoff wall through the embankment of the dam and dike #2, construction of a two-stage filter toe drain, rebuild of the dam crest and dike #2 crest, raising of canal road along the reservoir, construction of permanent and temporary access roads, removal and replacement of the existing outlet works, removal and replacement of the downstream check/wasteway structure in the ninepipe feeder canal, and relocation of g-canal downstream of the dam. This is just a summary of the main construction activities related to the project and the full description of the work to be performed can be found in the drawings and specifications.
Posted Date
Jun 16, 2026
Due Date
Jul 28, 2026
Release: Jun 16, 2026
Confederated Salish and Kootenai Tribes of the Flathead Reservation
Close: Jul 28, 2026
Construction of a cement-bentonite slurry cutoff wall through the embankment of the dam and dike #2, construction of a two-stage filter toe drain, rebuild of the dam crest and dike #2 crest, raising of canal road along the reservoir, construction of permanent and temporary access roads, removal and replacement of the existing outlet works, removal and replacement of the downstream check/wasteway structure in the ninepipe feeder canal, and relocation of g-canal downstream of the dam. This is just a summary of the main construction activities related to the project and the full description of the work to be performed can be found in the drawings and specifications.
AvailableConfederated Salish and Kootenai Tribes of the Flathead Reservation
The CSKT Tribal Credit Department is seeking qualified event planning professionals and firms to submit proposals to plan, coordinate, and support their 90th Anniversary Celebration scheduled for October 2026, which is expected to host approximately 250 guests. The scope of work includes comprehensive event planning, vendor coordination, branded materials development, and project management services. Proposals must include qualifications, experience, and an itemized budget, and must be submitted by June 30, 2026.
Posted Date
Jun 10, 2026
Due Date
Jun 30, 2026
Release: Jun 10, 2026
Confederated Salish and Kootenai Tribes of the Flathead Reservation
Close: Jun 30, 2026
The CSKT Tribal Credit Department is seeking qualified event planning professionals and firms to submit proposals to plan, coordinate, and support their 90th Anniversary Celebration scheduled for October 2026, which is expected to host approximately 250 guests. The scope of work includes comprehensive event planning, vendor coordination, branded materials development, and project management services. Proposals must include qualifications, experience, and an itemized budget, and must be submitted by June 30, 2026.
Confederated Salish and Kootenai Tribes of the Flathead Reservation
Works include approx. 1 LS steel casing pipe; 1 LS control building; 125 LF of side channel streambed material; 300 LF of side channel brush matrix; 2,500 CY field directed Eartwork.
Posted Date
Apr 30, 2026
Due Date
Jun 11, 2026
Release: Apr 30, 2026
Confederated Salish and Kootenai Tribes of the Flathead Reservation
Close: Jun 11, 2026
Works include approx. 1 LS steel casing pipe; 1 LS control building; 125 LF of side channel streambed material; 300 LF of side channel brush matrix; 2,500 CY field directed Eartwork.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge