Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Installation of HDPE piping across SR 14, east of Vine Street, and along SR 14 between Wind Ranch Road and Warner Lane, including water services, surface restoration, and traffic control, and other work
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Installation of pipelines, meters, valves and appurtenances, and rehabilitation of existing water pipelines includes cleaning and cement mortar lining of approx. 769 LF of 60" steel water main; structural lining of approx. 540 LF of 60" steel water main; furnishing and installing valves, precast and cast in place valve vaults, air valves, blow-off valve assemblies, manholes and all appurtenant work along the 12,207 LF.
Posted Date
Dec 3, 2025
Due Date
Jan 27, 2026
Release: Dec 3, 2025
Close: Jan 27, 2026
Installation of pipelines, meters, valves and appurtenances, and rehabilitation of existing water pipelines includes cleaning and cement mortar lining of approx. 769 LF of 60" steel water main; structural lining of approx. 540 LF of 60" steel water main; furnishing and installing valves, precast and cast in place valve vaults, air valves, blow-off valve assemblies, manholes and all appurtenant work along the 12,207 LF.
Available2" galvanized water main replacements little rock/wrightsville 2026 phase 1 installation of approx. 5,800 LF Of 6" ductile iron potable water main and 2,700 LF 3" PVC potable water main.
Posted Date
Jan 10, 2026
Due Date
Feb 3, 2026
Release: Jan 10, 2026
Close: Feb 3, 2026
2" galvanized water main replacements little rock/wrightsville 2026 phase 1 installation of approx. 5,800 LF Of 6" ductile iron potable water main and 2,700 LF 3" PVC potable water main.
AvailableWork includes approx 4,940 SY asphalt trench restoration; 4,760 LF 18" DIP raw water main; 1,200 LF 18" DIP raw water main with CLSM encasement; 650 LF fencing and gates; 1,415 LF 20" HDPE directional bore.
Posted Date
Jan 4, 2026
Due Date
Feb 4, 2026
Release: Jan 4, 2026
Close: Feb 4, 2026
Work includes approx 4,940 SY asphalt trench restoration; 4,760 LF 18" DIP raw water main; 1,200 LF 18" DIP raw water main with CLSM encasement; 650 LF fencing and gates; 1,415 LF 20" HDPE directional bore.
AvailableThis Contract provides for the pedestrian crosswalk and illumination improvements at the intersection of SR 14 and Alder Street including, to installation of RRFBs and related permanent signing, illumination system improvements, cement concrete curb ramp replacement, miscellaneous surface restoration, pavement markings, traffic control, and other work.
Posted Date
Jan 7, 2026
Due Date
Jan 27, 2026
Release: Jan 7, 2026
Close: Jan 27, 2026
This Contract provides for the pedestrian crosswalk and illumination improvements at the intersection of SR 14 and Alder Street including, to installation of RRFBs and related permanent signing, illumination system improvements, cement concrete curb ramp replacement, miscellaneous surface restoration, pavement markings, traffic control, and other work.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →