Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The work will consist of removing damaged girder, saw cutting and removing a portion of the SR 124/US 12 bridge deck and bridge rail, installing new girder, replacing removed bridge deck and bridge rail. The project also includes constructing a temporary median crossover for traffic control purposes, consisting of earthwork, subgrade construction, Commercial Hot Mix Asphalt, removal and reinstallation of guardrail, removal of the crossover, restoring delineation, traffic control and other work.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
This RFP is for the replacement of existing low-level bridges and construction of new bridges on SR 5 (US 1) over Pellicer Creek, including flexible pavement reconstruction, milling and resurfacing, base work, shoulder gutter, guardrail, soil stabilization, and signing/pavement markings.
Posted Date
Jan 28, 2026
Due Date
Jan 28, 2026
Release: Jan 28, 2026
Close: Jan 28, 2026
This RFP is for the replacement of existing low-level bridges and construction of new bridges on SR 5 (US 1) over Pellicer Creek, including flexible pavement reconstruction, milling and resurfacing, base work, shoulder gutter, guardrail, soil stabilization, and signing/pavement markings.
AvailableBridge repair work includes approx. 267 SY fine milling, 1,500 LF concrete median barrier, 2 EA changeable message sign, 3,800 LF 6" white thermoplastic stripe, 330 CY bridge deck overlay concrete, 470 LF saw cut.
Posted Date
Dec 23, 2025
Due Date
Jan 27, 2026
Release: Dec 23, 2025
Close: Jan 27, 2026
Bridge repair work includes approx. 267 SY fine milling, 1,500 LF concrete median barrier, 2 EA changeable message sign, 3,800 LF 6" white thermoplastic stripe, 330 CY bridge deck overlay concrete, 470 LF saw cut.
AvailableBridge No. 040171 on SR 1100 (Cranberry Springs Road) Over Gap Creek
Posted Date
May 15, 2025
Due Date
Jun 5, 2026
Release: May 15, 2025
Close: Jun 5, 2026
Bridge No. 040171 on SR 1100 (Cranberry Springs Road) Over Gap Creek
AvailableProcurement of engineering services for Phase A Final Right-of-Way Plans, Phase B Final Construction Plans, and Phase C Design and Review of Construction Engineering Services for the US 45 corridor widening and interchange improvements in Lee County, MS.
Posted Date
Jan 7, 2026
Due Date
Feb 12, 2026
Release: Jan 7, 2026
Close: Feb 12, 2026
Procurement of engineering services for Phase A Final Right-of-Way Plans, Phase B Final Construction Plans, and Phase C Design and Review of Construction Engineering Services for the US 45 corridor widening and interchange improvements in Lee County, MS.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis