Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The Town of Springfield is soliciting proposals from qualified engineering consultants to provide full engineering services for replacement of the Springfield Plaza pedestrian bridge over the Black River. The project is funded in part by Federal Highway Administration funds administered through the Vermont Agency of Transportation (Municipal Assistance) and supplemented by local town funding. The solicitation was posted January 16, 2026 and has a proposal submission deadline of February 15, 2026.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Replace an existing footbridge at the Miracle Field/Little League Complex with an ADA-compliant bridge to facilitate pedestrian access to the athletic fields. The proposed bridge is a replacement and an upgrade of the existing bridge, which has degraded over time. It would be in the same location. See attached file.
Posted Date
-
Due Date
Feb 3, 2026
Close: Feb 3, 2026
Replace an existing footbridge at the Miracle Field/Little League Complex with an ADA-compliant bridge to facilitate pedestrian access to the athletic fields. The proposed bridge is a replacement and an upgrade of the existing bridge, which has degraded over time. It would be in the same location. See attached file.
AvailableProvide street dual pedestrian bridge replacement project.
Posted Date
Jan 15, 2026
Due Date
Feb 5, 2026
Release: Jan 15, 2026
Close: Feb 5, 2026
Provide street dual pedestrian bridge replacement project.
AvailableProject includes the removal of the existing pedestrian bridge and parts of the existing concrete abutments to construct new concrete abutments and place a new steel pedestrian bridge. The scope of work includes, excavation, demolition, concrete work, stone placement and structure placement.
Posted Date
Jan 22, 2026
Due Date
Feb 26, 2026
Release: Jan 22, 2026
Close: Feb 26, 2026
Project includes the removal of the existing pedestrian bridge and parts of the existing concrete abutments to construct new concrete abutments and place a new steel pedestrian bridge. The scope of work includes, excavation, demolition, concrete work, stone placement and structure placement.
AvailableProcurement of services for the replacement of timber deck boards and columns on the Blue Heron Pedestrian Bridge.
Posted Date
Jan 5, 2026
Due Date
Feb 12, 2026
Release: Jan 5, 2026
Close: Feb 12, 2026
Procurement of services for the replacement of timber deck boards and columns on the Blue Heron Pedestrian Bridge.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis