Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Replace an existing footbridge at the Miracle Field/Little League Complex with an ADA-compliant bridge to facilitate pedestrian access to the athletic fields. The proposed bridge is a replacement and an upgrade of the existing bridge, which has degraded over time. It would be in the same location. See attached file.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Perform dismantling, removal, and disposal of the existing pedestrian bridge superstructure and designing, fabricating, furnishing and installing a replacement prefabricated pedestrian bridge superstructure attached to the existing bridge abutments with reconstructed anchor bolts. The replacement prefabricated pedestrian bridge superstructure shall resemble the attached original bridge plans in terms of make, general appearance and aesthetic appeal.
Posted Date
Jan 6, 2026
Due Date
Jan 22, 2026
Release: Jan 6, 2026
Close: Jan 22, 2026
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Perform dismantling, removal, and disposal of the existing pedestrian bridge superstructure and designing, fabricating, furnishing and installing a replacement prefabricated pedestrian bridge superstructure attached to the existing bridge abutments with reconstructed anchor bolts. The replacement prefabricated pedestrian bridge superstructure shall resemble the attached original bridge plans in terms of make, general appearance and aesthetic appeal.
Provide street dual pedestrian bridge replacement project.
Posted Date
Jan 15, 2026
Due Date
Feb 5, 2026
Release: Jan 15, 2026
Close: Feb 5, 2026
Provide street dual pedestrian bridge replacement project.
AvailableProcurement of services for the dismantling and removal of an existing pedestrian bridge superstructure, and the design, fabrication, furnishing, and installation of a replacement prefabricated pedestrian bridge superstructure.
Posted Date
Jan 6, 2026
Due Date
Jan 22, 2026
Release: Jan 6, 2026
Close: Jan 22, 2026
Procurement of services for the dismantling and removal of an existing pedestrian bridge superstructure, and the design, fabrication, furnishing, and installation of a replacement prefabricated pedestrian bridge superstructure.
AvailableProcurement of services for the replacement of timber deck boards and columns on the Blue Heron Pedestrian Bridge.
Posted Date
Jan 5, 2026
Due Date
Feb 12, 2026
Release: Jan 5, 2026
Close: Feb 12, 2026
Procurement of services for the replacement of timber deck boards and columns on the Blue Heron Pedestrian Bridge.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →