Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes construction and installation of water main and services.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Release: Nov 10, 2025
Close: Jan 5, 2026
Water main improvements.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Construction consists on installing 8,334 L.F. of 8" PVC Water Main and 1,135 LF of 2" PVC Water Main, connection to existing water main via tapping sleeve and valve, erosion control, traffic control, and all associated measures for the complete project.
Posted Date
Nov 25, 2025
Due Date
Jan 8, 2026
Release: Nov 25, 2025
Close: Jan 8, 2026
Construction consists on installing 8,334 L.F. of 8" PVC Water Main and 1,135 LF of 2" PVC Water Main, connection to existing water main via tapping sleeve and valve, erosion control, traffic control, and all associated measures for the complete project.
AvailableWork includes approx 7,595 LF 8" DIP class 52 with polyethylene wrap water main; 300 LF 8" DIP class 52 with polyethylene wrap water main by directional bore; 2,640 LF 1" PEX water service pipe by directional bore; 10 EA 6" PVC SDR-26 D2241 sanitary sewer service repair. See outside link.
Posted Date
Dec 22, 2025
Due Date
Feb 9, 2026
Release: Dec 22, 2025
Close: Feb 9, 2026
Work includes approx 7,595 LF 8" DIP class 52 with polyethylene wrap water main; 300 LF 8" DIP class 52 with polyethylene wrap water main by directional bore; 2,640 LF 1" PEX water service pipe by directional bore; 10 EA 6" PVC SDR-26 D2241 sanitary sewer service repair. See outside link.
AvailableLake lansing water control structure and site improvements.
Posted Date
-
Due Date
Jan 7, 2026
Close: Jan 7, 2026
Lake lansing water control structure and site improvements.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →