Connecticut Office of the Attorney General
State AgencyCT
Aug 12, 2026
Closes
Sep 16, 2026
Spot Improvements on River Street (Route 313) in the Town of Seymour RFP
Work inlcudes 550 CY earth excavation; 28 CY rock excavation; 1 EA special test pit water main; 365 LF cut concrete pavement; 200 SY removal of concrete pavement; 685 LF cut bituminous concrete pavement; 50 CY structure excavation; 5 CY structure excavation rock; 940 SY formation of subgrade; 209 CY subbase; 50 CY granular fill; 87 CY previous structure backfill; 7 CY controlled low strength material; 400 LF sedimentation control system. See attached file.