Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work consists of. Removing an existing 8-in flanged gate valve system along with long operating shaft extension and intermediate supports as well as a handwheel actuator and pedestal; furnishing and installing a new 8" flanged, knife gate valve system, electric motor actuator, along with long operating shaft extension, intermediate shaft supports, and a pedestal; furnishing and installing a flow sensor and controller system, including communications cable; furnishing and installing a skid-mounted solar powered operating system, complete with rechargeable batteries, solar panels, telemetry, enclosures, electronics, and appurtenances to provide sufficient power for the flow measurement system, the telemetry panel, and the chloride monitoring system as well as internal components for the solar powered operating system. Enclosure shall be sized to accommodate hardware and components to be furnished and installed by others; Furnishing and constructing a concrete pad for the new skid-mounted solar powered operating system and securing the skid platform to the concrete pad.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Construction of aeration improvements on existing water tower including pump station, piping and electrical.
Posted Date
Dec 11, 2025
Due Date
Jan 6, 2026
Release: Dec 11, 2025
Close: Jan 6, 2026
Construction of aeration improvements on existing water tower including pump station, piping and electrical.
AvailableWork includes: Surface preparation and recoating of exterior and interior of 150,000-gallon elevated spheroid water storage tank; Remove and replace existing vent; Furnish and install fall prevention on interior dry sections of tower and through existing access tube; Remove and replace riser pipe and isolation valve; Furnish and install new electrical mixer; Furnish and install pipe insulation
Posted Date
Nov 21, 2025
Due Date
Dec 18, 2025
Release: Nov 21, 2025
Close: Dec 18, 2025
Work includes: Surface preparation and recoating of exterior and interior of 150,000-gallon elevated spheroid water storage tank; Remove and replace existing vent; Furnish and install fall prevention on interior dry sections of tower and through existing access tube; Remove and replace riser pipe and isolation valve; Furnish and install new electrical mixer; Furnish and install pipe insulation
AvailableProvide spillway gate replacments. Replacement spillway gates components include: 1. Fabricate minimum five (5) and maximum eleven (11) new vertical lift steel spillway gates offsite Including paint, non-destructive testing (NDT), seals and seal heaters, cathodic protection, wheels, dogging and latching mechanisms. See attached file.
Posted Date
Apr 17, 2025
Due Date
Apr 29, 2028
Release: Apr 17, 2025
Close: Apr 29, 2028
Provide spillway gate replacments. Replacement spillway gates components include: 1. Fabricate minimum five (5) and maximum eleven (11) new vertical lift steel spillway gates offsite Including paint, non-destructive testing (NDT), seals and seal heaters, cathodic protection, wheels, dogging and latching mechanisms. See attached file.
Cpw is seeking personal services to inspect, clean, and assist cpw with maintenance of the spillway nets at both highline lake state park and elkhead reservoir state park.
Posted Date
Nov 25, 2025
Due Date
Jan 5, 2026
Release: Nov 25, 2025
Close: Jan 5, 2026
Cpw is seeking personal services to inspect, clean, and assist cpw with maintenance of the spillway nets at both highline lake state park and elkhead reservoir state park.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis