Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Construct 2,000 L.F. of 2\" DR-11 HDPE waterline, including 550 L.F. of 2\" directional bore, 104 L.F. of 4\" bore & steel casing w/ vents, 50 L.F. of 4\" bore & steel casing crossing concrete/asphalt driveways, 36 L.F. of 4\" trenched steel casing and all fittings, valves, meters and service connections as shown in the plans.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Project includes the following Work: Installation of approx. 10,750 LF of 3" PVC waterline with associated valves and ties to existing waterlines.
Posted Date
Jan 7, 2026
Due Date
Feb 6, 2026
Release: Jan 7, 2026
Close: Feb 6, 2026
Project includes the following Work: Installation of approx. 10,750 LF of 3" PVC waterline with associated valves and ties to existing waterlines.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Procurement of Professional Surveying and Design Engineering Services for the Alexis Road and Stewart Road Waterline Improvements Project, involving waterline replacement and installation.
Posted Date
Jan 26, 2026
Due Date
Feb 13, 2026
Release: Jan 26, 2026
Close: Feb 13, 2026
Procurement of Professional Surveying and Design Engineering Services for the Alexis Road and Stewart Road Waterline Improvements Project, involving waterline replacement and installation.
AvailableApprox. 1,000' of new 6" HDPE waterline with 600' of said line installed via directional boring.
Posted Date
Jan 15, 2026
Due Date
Feb 3, 2026
Release: Jan 15, 2026
Close: Feb 3, 2026
Approx. 1,000' of new 6" HDPE waterline with 600' of said line installed via directional boring.
AvailableThe project generally includes installation of approx. 11,400 feet of 8” and 16” PVC waterline and 10,300 feet of 12” PVC sanitary sewer along Summit Road and Morse Road in Licking County, Ohio. The project includes waterline and sanitary sewer piping installation via horizontal directional drilling and jack and bore methods.
Posted Date
Jan 2, 2026
Due Date
Feb 5, 2026
Release: Jan 2, 2026
Close: Feb 5, 2026
The project generally includes installation of approx. 11,400 feet of 8” and 16” PVC waterline and 10,300 feet of 12” PVC sanitary sewer along Summit Road and Morse Road in Licking County, Ohio. The project includes waterline and sanitary sewer piping installation via horizontal directional drilling and jack and bore methods.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →