Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project includes the following Work: Installation of approx. 10,750 LF of 3" PVC waterline with associated valves and ties to existing waterlines.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
The project generally includes installation of approx. 11,400 feet of 8” and 16” PVC waterline and 10,300 feet of 12” PVC sanitary sewer along Summit Road and Morse Road in Licking County, Ohio. The project includes waterline and sanitary sewer piping installation via horizontal directional drilling and jack and bore methods.
Posted Date
Jan 2, 2026
Due Date
Feb 5, 2026
Release: Jan 2, 2026
Close: Feb 5, 2026
The project generally includes installation of approx. 11,400 feet of 8” and 16” PVC waterline and 10,300 feet of 12” PVC sanitary sewer along Summit Road and Morse Road in Licking County, Ohio. The project includes waterline and sanitary sewer piping installation via horizontal directional drilling and jack and bore methods.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The Lafayette Parish Waterworks District North is soliciting sealed bids for furnishing and installing water lines, fittings, valves, and related components for the Landry Road Waterline Extension Project Phase 2 from Tabb Road to the Scott waterline tie-in. Bidding documents may be obtained electronically via CentralBidding or as hard copies at the Lafayette Parish Waterworks District North office; sealed bids may be submitted electronically via CentralBidding or in person. Bids are due at 10:00 a.m. on February 4, 2026, and late bids will be returned unopened.
Posted Date
Jan 6, 2026
Due Date
Feb 4, 2026
Release: Jan 6, 2026
Close: Feb 4, 2026
The Lafayette Parish Waterworks District North is soliciting sealed bids for furnishing and installing water lines, fittings, valves, and related components for the Landry Road Waterline Extension Project Phase 2 from Tabb Road to the Scott waterline tie-in. Bidding documents may be obtained electronically via CentralBidding or as hard copies at the Lafayette Parish Waterworks District North office; sealed bids may be submitted electronically via CentralBidding or in person. Bids are due at 10:00 a.m. on February 4, 2026, and late bids will be returned unopened.
AvailableProject consists of construction services for the relocating and installing a portion of 4” waterline that includes a 20 LF conventional road bore, ±210 LF of 4” Class 350 Ductile Iron Pipe, two (2) 4” gate valves, creek crossing, and water related appurtenances.
Posted Date
Dec 8, 2025
Due Date
Jan 14, 2026
Release: Dec 8, 2025
Close: Jan 14, 2026
Project consists of construction services for the relocating and installing a portion of 4” waterline that includes a 20 LF conventional road bore, ±210 LF of 4” Class 350 Ductile Iron Pipe, two (2) 4” gate valves, creek crossing, and water related appurtenances.
AvailableInstallation of 2,256 LF of 12, 8, and 10" PVC potable waterline, including all fittings, valves, and connections, excavation, shoring, bedding and backfill; surface restoration, including pavement and sidewalks; reconnection of existing water services; temporary erosion and sediment controls; all labor, equipment, materials, and incidentals necessary to complete the work.
Posted Date
Dec 11, 2025
Due Date
Jan 21, 2026
Release: Dec 11, 2025
Close: Jan 21, 2026
Installation of 2,256 LF of 12, 8, and 10" PVC potable waterline, including all fittings, valves, and connections, excavation, shoring, bedding and backfill; surface restoration, including pavement and sidewalks; reconnection of existing water services; temporary erosion and sediment controls; all labor, equipment, materials, and incidentals necessary to complete the work.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →