Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Approx. 1,000' of new 6" HDPE waterline with 600' of said line installed via directional boring.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Project includes the following Work: Installation of approx. 10,750 LF of 3" PVC waterline with associated valves and ties to existing waterlines.
Posted Date
Jan 7, 2026
Due Date
Feb 6, 2026
Release: Jan 7, 2026
Close: Feb 6, 2026
Project includes the following Work: Installation of approx. 10,750 LF of 3" PVC waterline with associated valves and ties to existing waterlines.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Furnishing and installation of approx. 2,503 linear feet of 6” HDPE IPS DR 11 waterline with associated valves and appurtenances, along with surface restoration, testing, disinfection, installation of water services, and bore with 16” HDPE IPS DR 9 pipe.
Posted Date
Jan 9, 2026
Due Date
Feb 19, 2026
Release: Jan 9, 2026
Close: Feb 19, 2026
Furnishing and installation of approx. 2,503 linear feet of 6” HDPE IPS DR 11 waterline with associated valves and appurtenances, along with surface restoration, testing, disinfection, installation of water services, and bore with 16” HDPE IPS DR 9 pipe.
AvailableWork includes 1 LS trench safety protective systems (all depths); 2 EA wet connections, 12" dia x 12" dia; 64 LF factory restrained joint pipe, 12" dia c900 dr18 PVC (all depths), includes excavation and backfill; 55 LF open-cut steel encasement pipe 20" dia, 3/8" thick steel with 12" c900 dr18 carrier pipe; 1 EA gate valve, 8" install only- valves provided by the city; 4 ea ductile iron fittings install only fittings provided by the city; 4 EA ductile iron fittings (bends); 1 LS erosion control measures and swppp; 500 CY seeding; 500 SY top soil; 9 tgl vegetative watering; 1 LS barricades, signs, & traffic handling.
Posted Date
Jan 9, 2026
Due Date
Feb 2, 2026
Release: Jan 9, 2026
Close: Feb 2, 2026
Work includes 1 LS trench safety protective systems (all depths); 2 EA wet connections, 12" dia x 12" dia; 64 LF factory restrained joint pipe, 12" dia c900 dr18 PVC (all depths), includes excavation and backfill; 55 LF open-cut steel encasement pipe 20" dia, 3/8" thick steel with 12" c900 dr18 carrier pipe; 1 EA gate valve, 8" install only- valves provided by the city; 4 ea ductile iron fittings install only fittings provided by the city; 4 EA ductile iron fittings (bends); 1 LS erosion control measures and swppp; 500 CY seeding; 500 SY top soil; 9 tgl vegetative watering; 1 LS barricades, signs, & traffic handling.
AvailableRelease: Jan 9, 2026
Close: Jan 29, 2026
Waterline Improvements.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →