Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work consists of 1 LS excavate and remediate pits for sewer pipe bursting, 20 EA reconstruct manholes and sewer lateral connections, 9,100 LF replace existing 8" VCP sewer line with 12" HDPE pipe via bursting. Reconstruct all manholes and lateral connections, 200 LF replace existing 6" VCP sewer line with 8" HDPE via pipe bursting. Reconstruct all manholes and lateral connections, 420 LF installation of cured-in-place pipe (CIPP) lining - 8" diameter sewer pipe. Contractor shall protect existing manhole, 1 LS video inspection after installation of CCTV. See outside link.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
872 LF sewer line replacement, 6 manholes, 13 service connections, & 520 LF surface repair.
Posted Date
Jan 17, 2026
Due Date
Feb 10, 2026
Release: Jan 17, 2026
Close: Feb 10, 2026
872 LF sewer line replacement, 6 manholes, 13 service connections, & 520 LF surface repair.
AvailableReplacement of approximately 641 linear feet of existing 8" VCP sewer main with 8” PVC sewer main, and two (2) manholes.
Posted Date
Jan 23, 2026
Due Date
Feb 12, 2026
Release: Jan 23, 2026
Close: Feb 12, 2026
Replacement of approximately 641 linear feet of existing 8" VCP sewer main with 8” PVC sewer main, and two (2) manholes.
AvailableThe Jeffersonville Sewer Board is soliciting bids for the Youngstown Sewer Replacement project in Jeffersonville, Indiana. The work includes approximately 850 LF of 8‑inch PVC gravity sewer, five new sanitary sewer manholes, about 1,500 LF of 6‑inch service connections, lining of roughly 136 LF of existing 8‑inch VCP with service reinstatements, and abandonment of about 800 LF of existing 8‑inch VCP sewer and manholes. Bids are due to the City Clerk by 2:00 PM EST on January 28, 2026, and bidding documents are available via Lynn Imaging starting January 9, 2026, with an expected project duration of 90 days.
Posted Date
-
Due Date
Jan 28, 2026
Release: -
Close: Jan 28, 2026
The Jeffersonville Sewer Board is soliciting bids for the Youngstown Sewer Replacement project in Jeffersonville, Indiana. The work includes approximately 850 LF of 8‑inch PVC gravity sewer, five new sanitary sewer manholes, about 1,500 LF of 6‑inch service connections, lining of roughly 136 LF of existing 8‑inch VCP with service reinstatements, and abandonment of about 800 LF of existing 8‑inch VCP sewer and manholes. Bids are due to the City Clerk by 2:00 PM EST on January 28, 2026, and bidding documents are available via Lynn Imaging starting January 9, 2026, with an expected project duration of 90 days.
The project includes removal and replacement of sanitary sewer pipes and manholes, replacement of storm sewer pipe, asphalt roadway restoration, and related site restorations.
Posted Date
Jan 13, 2026
Due Date
Jan 30, 2026
Release: Jan 13, 2026
Close: Jan 30, 2026
The project includes removal and replacement of sanitary sewer pipes and manholes, replacement of storm sewer pipe, asphalt roadway restoration, and related site restorations.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis