Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project is generally described as paving and drainage improvements that generally include site clearing/preparation, construction/installation of approximately 11,500 SY (Base Bid = 8,050 SY & Additive Bid = 3,450 SY) of reinforced concrete pavement, drainage improvements, illumination facilities, striping, signage, water distribution improvements, and other associated work. 40 LF Furnish & Install Boring (No Casing) and a 10" PVC (C-900) Carrier Pipe; 2,050 LF Furnish & Install 10" PVC (C-900) Pipe including Tracer Wire;
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
The work includes milling and paving, HMA profile milling, full depth pavement repair, upgrading bicycle safe grates/eco curb pieces, drainage improvements, as well as other improvements depicted within the Construction Plans. Alternate Bid ‘A' consists of installation of 24” precast polymer concrete trench drain at the intersection of Studio Road and Day Avenue.
Posted Date
Dec 11, 2025
Due Date
Jan 8, 2026
Release: Dec 11, 2025
Close: Jan 8, 2026
The work includes milling and paving, HMA profile milling, full depth pavement repair, upgrading bicycle safe grates/eco curb pieces, drainage improvements, as well as other improvements depicted within the Construction Plans. Alternate Bid ‘A' consists of installation of 24” precast polymer concrete trench drain at the intersection of Studio Road and Day Avenue.
AvailableProject includes, but is not limited to: saw cutting, removal and disposal of existing asphalt, curb and sidewalk; salvaging the existing road base; asphalt milling; installation of new potable water main and reconnecting services; installation of new storm sewer; trench backfill; street, curb and sidewalk subgrade; concrete curb; asphalt sidewalk; asphalt roadway; and landscape restoration.
Posted Date
Dec 10, 2025
Due Date
Feb 5, 2026
Release: Dec 10, 2025
Close: Feb 5, 2026
Project includes, but is not limited to: saw cutting, removal and disposal of existing asphalt, curb and sidewalk; salvaging the existing road base; asphalt milling; installation of new potable water main and reconnecting services; installation of new storm sewer; trench backfill; street, curb and sidewalk subgrade; concrete curb; asphalt sidewalk; asphalt roadway; and landscape restoration.
The Town of Sewall's Point is soliciting bids for Phase 2 of the South Sewall's Point Road enhancement, consisting of roadway and stormwater improvements including the addition of a baffle box at Outfall No. 1. The project is funded by an FDEP Resiliency Grant, with substantial completion required by June 1, 2026 and final completion by June 15, 2026, and bids close on 2025-12-17.
Posted Date
Nov 14, 2025
Due Date
Dec 17, 2025
Release: Nov 14, 2025
Close: Dec 17, 2025
The Town of Sewall's Point is soliciting bids for Phase 2 of the South Sewall's Point Road enhancement, consisting of roadway and stormwater improvements including the addition of a baffle box at Outfall No. 1. The project is funded by an FDEP Resiliency Grant, with substantial completion required by June 1, 2026 and final completion by June 15, 2026, and bids close on 2025-12-17.
Work consists of improving the pavement structure to the existing unpaved roadway for approximately 2.132 miles.
Posted Date
Dec 11, 2025
Due Date
Feb 13, 2026
Release: Dec 11, 2025
Close: Feb 13, 2026
Work consists of improving the pavement structure to the existing unpaved roadway for approximately 2.132 miles.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis