Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work consists of improving the pavement structure to the existing unpaved roadway for approximately 2.132 miles.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Roadway, drainage, and safety improvements to Road (CR 544).
Posted Date
Dec 31, 2025
Due Date
Feb 5, 2026
Release: Dec 31, 2025
Close: Feb 5, 2026
Roadway, drainage, and safety improvements to Road (CR 544).
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Roadway Improvements consists, but not limited to all labor, material and equipment necessary or required to complete all proposed improvements. The project generally entails milling of existing asphalt roadway, new asphalt roadway, curbing, sidewalk, signage, striping and top soiling / hydro-seeding.
Posted Date
Jan 16, 2026
Due Date
Feb 4, 2026
Release: Jan 16, 2026
Close: Feb 4, 2026
Roadway Improvements consists, but not limited to all labor, material and equipment necessary or required to complete all proposed improvements. The project generally entails milling of existing asphalt roadway, new asphalt roadway, curbing, sidewalk, signage, striping and top soiling / hydro-seeding.
AvailableThe Gila River Indian Community issued IFB-0634-DOT for Orchard Road Phase II to reconstruct one mile of roadway between Casa Blanca Road and Nelson Road in District 5. Scope includes installing CMP culverts, scarifying and recompacting the road prism, bringing fill material, placing 6 inches of aggregate base, applying double chip seal and fog seal, and installing striping. The project requires a bid bond, contractor qualification statement, Arizona contractor license, and offers Native American preference documentation where applicable.
Posted Date
-
Due Date
Feb 19, 2026
Close: Feb 19, 2026
The Gila River Indian Community issued IFB-0634-DOT for Orchard Road Phase II to reconstruct one mile of roadway between Casa Blanca Road and Nelson Road in District 5. Scope includes installing CMP culverts, scarifying and recompacting the road prism, bringing fill material, placing 6 inches of aggregate base, applying double chip seal and fog seal, and installing striping. The project requires a bid bond, contractor qualification statement, Arizona contractor license, and offers Native American preference documentation where applicable.
AvailableRoadway improvements.
Posted Date
-
Due Date
Jan 29, 2026
Release: -
Close: Jan 29, 2026
Roadway improvements.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →