Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The Town of Sewall's Point is soliciting bids for Phase 2 of the South Sewall's Point Road enhancement, consisting of roadway and stormwater improvements including the addition of a baffle box at Outfall No. 1. The project is funded by an FDEP Resiliency Grant, with substantial completion required by June 1, 2026 and final completion by June 15, 2026, and bids close on 2025-12-17.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Premium
Access the largest public sector contact database
Work includes roadway improvements, stormwater improvements that include two separate exfiltration systems, existing sheet pile weir in the stormwater treatment area no. 1 and includes adding a baffle box at outfall no. 1, portable generator to be located to service the existing and future back-up pump systems.
Posted Date
Nov 18, 2025
Due Date
Dec 17, 2025
Release: Nov 18, 2025
Close: Dec 17, 2025
Work includes roadway improvements, stormwater improvements that include two separate exfiltration systems, existing sheet pile weir in the stormwater treatment area no. 1 and includes adding a baffle box at outfall no. 1, portable generator to be located to service the existing and future back-up pump systems.
AvailableThe City of Miami Springs seeks a qualified contractor to construct the South Drive Stormwater and Roadway Improvement Project to provide water quality, stormwater management, and beautification along the South Drive corridor. The scope includes localized drainage, roadway geometry and landscape improvements, enhancements to roundabouts, and measures to accommodate pedestrian, cyclist, and motorist safety while reducing flooding. This opportunity is issued as an Invitation for Bid (ITB) and includes a mandatory pre-bid meeting; supporting bid documents are available on the original posting linked from the aggregator.
Posted Date
Dec 4, 2025
Due Date
Jan 27, 2026
Release: Dec 4, 2025
Close: Jan 27, 2026
The City of Miami Springs seeks a qualified contractor to construct the South Drive Stormwater and Roadway Improvement Project to provide water quality, stormwater management, and beautification along the South Drive corridor. The scope includes localized drainage, roadway geometry and landscape improvements, enhancements to roundabouts, and measures to accommodate pedestrian, cyclist, and motorist safety while reducing flooding. This opportunity is issued as an Invitation for Bid (ITB) and includes a mandatory pre-bid meeting; supporting bid documents are available on the original posting linked from the aggregator.
AvailableRemoval of approximately 92 LF of two 35"x24" arch-corrugated metal pipes (CMP) and the surrounding pavement. The Project includes the installation of two new 34"x53" elliptical reinforced concrete pipes (RCP), one being 67 LF and one being 73 LF, as well as two new concrete headwalls. Approximately 166 LF of guardrail will also be installed. The road will be restored after the new culvert is installed.
Posted Date
Dec 10, 2025
Due Date
Jan 14, 2026
Release: Dec 10, 2025
Close: Jan 14, 2026
Removal of approximately 92 LF of two 35"x24" arch-corrugated metal pipes (CMP) and the surrounding pavement. The Project includes the installation of two new 34"x53" elliptical reinforced concrete pipes (RCP), one being 67 LF and one being 73 LF, as well as two new concrete headwalls. Approximately 166 LF of guardrail will also be installed. The road will be restored after the new culvert is installed.
AvailableRelease: Nov 26, 2025
Close: Dec 30, 2025
Road improvement project.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis