Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project includes the following Work:The work generally consists of furnishing materials, labor, and equipment required to construct either a composite or single pedestal steel spheroid 1-MG elevated storage reservoir. Work includes excavation, foundation construction, tower pedestal and tank construction, internal and external appurtenances, controls systems, process piping, mechanical mixer, interior and exterior coatings, grading, site piping, construction of access road and parking, minor drainage infrastructure, and related incidental work.The Project has an expected substantial completion date of November 15, 2027. The estimated cost of this project is approximately $6.5 million. The type of bid required shall be a lump sum bid for a single prime contract. There are no alternate bid items for this contract.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Procurement for the construction of an 18-inch water transmission line, involving open trench pipeline installation, horizontal directional drilling (HDD) for crossings, tie-ins, air release valve vaults, and surface restoration.
Posted Date
Jan 25, 2026
Due Date
Feb 18, 2026
Release: Jan 25, 2026
Close: Feb 18, 2026
Procurement for the construction of an 18-inch water transmission line, involving open trench pipeline installation, horizontal directional drilling (HDD) for crossings, tie-ins, air release valve vaults, and surface restoration.
AvailableProvide professional engineering services to design a new water storage tank & transmission main (tower #5).
Posted Date
Jan 13, 2026
Due Date
Feb 3, 2026
Release: Jan 13, 2026
Close: Feb 3, 2026
Provide professional engineering services to design a new water storage tank & transmission main (tower #5).
AvailableMuddy river phase II south landscape maintenance.
Posted Date
Jan 20, 2026
Due Date
Feb 5, 2026
Release: Jan 20, 2026
Close: Feb 5, 2026
Muddy river phase II south landscape maintenance.
AvailableConstruction of a 2.0MG composite elevated water tower (CET) with associated piping and site improvements.
Posted Date
Dec 16, 2025
Due Date
Feb 12, 2026
Release: Dec 16, 2025
Close: Feb 12, 2026
Construction of a 2.0MG composite elevated water tower (CET) with associated piping and site improvements.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis