Lynn Water And Sewer Commission
Special DistrictMA
Posted
Nov 11, 2026
Dec 30, 2026
Fire Hydrant Replacement RFP
Replacement of fire hydrants within the city.
Description: Albany County is seeking bids to replace yard and fire hydrants at its South Plant. The work includes isolation valves and related parts needed to return the hydrants to service. Questions are due December 7, 2026, and bids are submitted electronically through BidNet Direct.
County · NY, US
Adjacent opportunities open for bidding right now.
Lynn Water And Sewer Commission
Special DistrictMA
Posted
Nov 11, 2026
Dec 30, 2026
Replacement of fire hydrants within the city.
Lynn Water And Sewer Commission
Special DistrictMA
Posted
Nov 11, 2026
Dec 8, 2026
Lynn Water & Sewer Commission invites vendors to submit bids for replacement of fire hydrants within the city of Lynn. The solicitation lists replacement of fire hydrants within Lynn as its single line item. Bids opened on November 11, 2026, and are due December 8, 2026, at 11:00 a.m.
CityCT
Posted
Oct 30, 2026
Dec 2, 2026
This project consists of the construction of one (1) 50-foot diameter secondary clarifier tank and mechanism, relocation of yard piping to facilitate the installation of the secondary tank, manholes, distribution box with slide gates, yard piping, valves, and appurtenances for complete and operational secondary clarifier tank. Additionally, the waterproofing of the RAS/WAS pump station inclusive of louver and exhaust fan relocations with brick infill of the existing locations and floodproof doors. This project also consists of three (3) bid alternates. Bid Alternate No. 1 consists of RAS/WAS pump station upgrades inclusive of RAS/WAS pumps, flow meters, process valves, piping, fitting, pipe supports, and appurtenances replacement. Bid Alternate No. 2 consists of minor RAS/WAS pump station upgrades inclusive of flow meters and process valve replacements. Bid Alternate No. 3 consists of the removal and proper disposal of the existing two (2) 30-foot diameter secondary clarifier tanks, distribution box, and yard piping as indicated. Additionally, it will consist of the construction of one additional (1) 50-foot diameter secondary clarifier tank and mechanism, yard piping, and appurtenances for complete and operational secondary clarifier tank. See attached files.
CitySC
Posted
Nov 17, 2026
Dec 9, 2026
This solicitation seeks a contractor to remove and replace three 16-inch raw water swing check valves, install three air release valves, and install three new 16-inch couplings at the Seneca Water Treatment Plant raw water structure. Valves, air release valves, and couplings will be owner‑procured; the contractor is responsible for all bolts, gaskets, accessories, equipment, labor, hauling, installation, startup testing, and making the system fully operational. Work is anticipated to begin in February or March 2027 and is expected to be completed in six weeks or less.
Decision makers connected to this RFP from Albany County.
Solicitation files and supporting documents for this bid.