Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Decommissioning of five (5) potable water wells.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Construct approx., 8,152' of 4" - 10" diameter watermain, the abandonment of (2) wells, the demolition of the elevated water storage tank and ground level storage tank.
Posted Date
Dec 4, 2025
Due Date
Jan 21, 2026
Release: Dec 4, 2025
Close: Jan 21, 2026
Construct approx., 8,152' of 4" - 10" diameter watermain, the abandonment of (2) wells, the demolition of the elevated water storage tank and ground level storage tank.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Site preparation, mobilization and demobilization; remediation system disassembly, removal, and disposal; 120 LF, sawcut existing paving - equipment compound perimeter; 120 LF, remove, haul, and dispose of 6" concrete curb around equipment compound; 650 SF, remove, haul, and dispose concrete slab (6" Thickness) at equipment compound. Includes removal and backfill of grated sump with cdf; 650 SF, asphalt concrete repaving - equipment compound footprint; abandon force main discharge connection; 7 ea, remove, haul, and dispose of removable steel bollards. Backfill with cdf to 6" minus and repave to match existing conditions. See attached file.
Posted Date
Dec 4, 2025
Due Date
Jan 13, 2026
Release: Dec 4, 2025
Close: Jan 13, 2026
Site preparation, mobilization and demobilization; remediation system disassembly, removal, and disposal; 120 LF, sawcut existing paving - equipment compound perimeter; 120 LF, remove, haul, and dispose of 6" concrete curb around equipment compound; 650 SF, remove, haul, and dispose concrete slab (6" Thickness) at equipment compound. Includes removal and backfill of grated sump with cdf; 650 SF, asphalt concrete repaving - equipment compound footprint; abandon force main discharge connection; 7 ea, remove, haul, and dispose of removable steel bollards. Backfill with cdf to 6" minus and repave to match existing conditions. See attached file.
AvailableThe project requires permanent abandonment of three existing interconnections between Eastern Municipal Water District (EMWD) and Western Municipal Water District (WMWD) at the Alessandro, Westgate, and Eastgate service connections. It is a public bid issued by Western Municipal Water District with a pre-bid (optional) Teams meeting and a response deadline of January 15, 2026.
Posted Date
Dec 4, 2025
Due Date
Jan 15, 2026
Release: Dec 4, 2025
Close: Jan 15, 2026
The project requires permanent abandonment of three existing interconnections between Eastern Municipal Water District (EMWD) and Western Municipal Water District (WMWD) at the Alessandro, Westgate, and Eastgate service connections. It is a public bid issued by Western Municipal Water District with a pre-bid (optional) Teams meeting and a response deadline of January 15, 2026.
AvailableConstruction of water well no. 4 including electrical components, well header, yard piping, site improvements, and all related appurtenances.
Posted Date
Dec 17, 2025
Due Date
Jan 22, 2026
Release: Dec 17, 2025
Close: Jan 22, 2026
Construction of water well no. 4 including electrical components, well header, yard piping, site improvements, and all related appurtenances.