Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The project requires permanent abandonment of three existing interconnections between Eastern Municipal Water District (EMWD) and Western Municipal Water District (WMWD) at the Alessandro, Westgate, and Eastgate service connections. It is a public bid issued by Western Municipal Water District with a pre-bid (optional) Teams meeting and a response deadline of January 15, 2026.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Boiler Interconnection Project.
Posted Date
Nov 27, 2025
Due Date
Dec 22, 2025
Release: Nov 27, 2025
Close: Dec 22, 2025
Boiler Interconnection Project.
AvailablePremium
Access the largest public sector contact database
Project includes abandonment of two well.
Posted Date
Dec 4, 2025
Due Date
Jan 2, 2026
Release: Dec 4, 2025
Close: Jan 2, 2026
Project includes abandonment of two well.
AvailableThe Lansing Board of Water & Light (BWL) seeks a contractor to abandon three groundwater wells (85-01, 85-02, 85-03) including mobilization, abandonment to grade, demobilization, and reporting to the State of Michigan. Bids are evaluated on price, unit pricing, experience, acceptance of terms, schedule, and competitiveness, and work is expected to be completed before April 30, 2026.
Posted Date
Nov 18, 2025
Due Date
Dec 19, 2025
Release: Nov 18, 2025
Close: Dec 19, 2025
The Lansing Board of Water & Light (BWL) seeks a contractor to abandon three groundwater wells (85-01, 85-02, 85-03) including mobilization, abandonment to grade, demobilization, and reporting to the State of Michigan. Bids are evaluated on price, unit pricing, experience, acceptance of terms, schedule, and competitiveness, and work is expected to be completed before April 30, 2026.
AvailableWork includes: abandoning BWL Wells 85-01, 85-02, and 85-03, which are screened Type 1 community wells with no pumps or internal equipment and equipped with pitless adapters. Work includes full mobilization, setup, abandonment to grade, demobilization, and reporting the abandoned status to the State of Michigan in accordance with the Michigan Water Well Construction and Pump Installation Code (Part 127, Act 368, PA 1978; Rules R 325.1662–1670). Contractor must provide lump-sum pricing based on existing well information, supply unit pricing per cubic foot of fill material for volume variances, account for 20% grout loss through the screen, and save/present cement/material slips for verification. Expected fill volumes are 657.38 ft³ for Well 85-01, 150.21 ft³ for Well 85-02, and 185.55 ft³ for Well 85-03.
Posted Date
Nov 18, 2025
Due Date
Dec 19, 2025
Release: Nov 18, 2025
Close: Dec 19, 2025
Work includes: abandoning BWL Wells 85-01, 85-02, and 85-03, which are screened Type 1 community wells with no pumps or internal equipment and equipped with pitless adapters. Work includes full mobilization, setup, abandonment to grade, demobilization, and reporting the abandoned status to the State of Michigan in accordance with the Michigan Water Well Construction and Pump Installation Code (Part 127, Act 368, PA 1978; Rules R 325.1662–1670). Contractor must provide lump-sum pricing based on existing well information, supply unit pricing per cubic foot of fill material for volume variances, account for 20% grout loss through the screen, and save/present cement/material slips for verification. Expected fill volumes are 657.38 ft³ for Well 85-01, 150.21 ft³ for Well 85-02, and 185.55 ft³ for Well 85-03.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis