Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project consists of retaining wall removal, removal of existing dock system, gangway, and foundations, complete, excavation, subbase granular material, type b, 8", PCC pavement 8" special, concrete structures (concrete abutment w/ steel reinf.), floating dock system, dock anchors, traffic control and protection, riprap RR4, 16", obstructions during drilling, mobilization.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Replacement of the existing walk in freezer and cooler at the loading dock doors in building includes removal of the decommissioned freezer/cooler in building 7.
Posted Date
Dec 29, 2025
Due Date
Jan 29, 2026
Release: Dec 29, 2025
Close: Jan 29, 2026
Replacement of the existing walk in freezer and cooler at the loading dock doors in building includes removal of the decommissioned freezer/cooler in building 7.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes replace existing dock door with a taller one. Exterior wall/framing may need to be replaced, pending the existing metal stud framing. Exterior wall opening will be increased.
Posted Date
Jan 12, 2026
Due Date
Feb 5, 2026
Release: Jan 12, 2026
Close: Feb 5, 2026
Work includes replace existing dock door with a taller one. Exterior wall/framing may need to be replaced, pending the existing metal stud framing. Exterior wall opening will be increased.
AvailableRemove, provide and replace dock 22 leveler.
Posted Date
Jan 15, 2026
Due Date
Feb 5, 2026
Release: Jan 15, 2026
Close: Feb 5, 2026
Remove, provide and replace dock 22 leveler.
AvailableThe Contractor shall provide all tools, materials, supplies, equipment, supervision, transportation and required licensed personnel to provide the following services: 1. Will remove the 2 existing Hydraulic Pit Levelers in dock 4,5. 2. Replace them with 2 new Power Ramp Hydraulic Pil Levelers with barrier lips, Trailer Restraints, Power Ramp Trailer Restraint Wheel Chock, 3. Install at all 6 docking positions new 10” clear opening manual lift gates. See attached file.
Posted Date
Jan 6, 2026
Due Date
Jan 28, 2026
Release: Jan 6, 2026
Close: Jan 28, 2026
The Contractor shall provide all tools, materials, supplies, equipment, supervision, transportation and required licensed personnel to provide the following services: 1. Will remove the 2 existing Hydraulic Pit Levelers in dock 4,5. 2. Replace them with 2 new Power Ramp Hydraulic Pil Levelers with barrier lips, Trailer Restraints, Power Ramp Trailer Restraint Wheel Chock, 3. Install at all 6 docking positions new 10” clear opening manual lift gates. See attached file.