Posted
Oct 23, 2026
Nov 6, 2026
Subsurface Investigation Atlantic Intracoastal Waterway Disposal Area 60 - SOURCES SOUGHT NOTICE -
Subsurface investigation atlantic intracoastal waterway disposal area 60. The Contractor shall mobilize all necessary personnel, equipment, and materials to DA 60, to conduct a comprehensive geotechnical investigation. Methods of investigation should accurately locate changes in the soil strata. Equipment shall be able to traverse the site in wet, soft, or dry conditions. See attached file.
