Space Training and Readiness Command
FederalCO
Posted
Sep 8, 2026
Sep 14, 2026
Sources Sought - Electrical Circuit and Receptacle Installation
Install two new 30amp four wire 120/208-volt electrical circuits with twist lock receptacles to be installed in building 2025 room 120 to support one new mission system electronic equipment rack for the meshONE-T program.