Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Constructing a solid waste convenience center that consists of the following: prefabricated attendant building, cast in place concrete retaining walls, paved areas (concrete and asphalt), yard waste and waste tire stockpile areas, utilities (electrical, water, sewer) and erosion control devices (sediment basin, channels, and culverts).
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Constructing a solid waste convenience center that consists of the following: prefabricated attendant building, cast in place concrete retaining walls, paved areas (concrete and asphalt), yard waste and waste tire stockpile areas, utilities (electrical, water, sewer) and erosion control devices (sediment basin, channels, and culverts).
Posted Date
Jan 9, 2026
Due Date
Feb 17, 2026
Release: Jan 9, 2026
Close: Feb 17, 2026
Constructing a solid waste convenience center that consists of the following: prefabricated attendant building, cast in place concrete retaining walls, paved areas (concrete and asphalt), yard waste and waste tire stockpile areas, utilities (electrical, water, sewer) and erosion control devices (sediment basin, channels, and culverts).
AvailableWork includes 1 LS demolition; 1 LS erosion and sediment control and maintenance; 1,400 LF chain link fence; 8,000 CY site grading; 2,000 CY unsuitable soil excavation and replacement; 33,400 SF concrete pavement; 66,700 SF site asphalt pavement; 10,000 SF suburban lane pavement; 44,100 SF stone areas; 180 LF guardrail; 1 LS retaining wall; 1 LS micropiles for retaining wall; 1 LS sewer forcemain; 1 LS water line ; 1,805 LF electrical rough-in for site lighting; 720 LF pole mounted camera rough-in; 1 LS compactor electrical service; 1 LS attendant building. See outside link.
Posted Date
Jan 16, 2026
Due Date
Feb 17, 2026
Release: Jan 16, 2026
Close: Feb 17, 2026
Work includes 1 LS demolition; 1 LS erosion and sediment control and maintenance; 1,400 LF chain link fence; 8,000 CY site grading; 2,000 CY unsuitable soil excavation and replacement; 33,400 SF concrete pavement; 66,700 SF site asphalt pavement; 10,000 SF suburban lane pavement; 44,100 SF stone areas; 180 LF guardrail; 1 LS retaining wall; 1 LS micropiles for retaining wall; 1 LS sewer forcemain; 1 LS water line ; 1,805 LF electrical rough-in for site lighting; 720 LF pole mounted camera rough-in; 1 LS compactor electrical service; 1 LS attendant building. See outside link.
DeSoto Parish Police Jury is soliciting sealed and electronic bids for the Solid Waste Improvements at the Stonewall Compactor Site, including a new left turn lane on LA 171, a new asphalt roadway with soil-cement base and drainage, and construction of the compactor site with asphalt pavement, soil-cement, and a retaining wall. A mandatory pre-bid conference is scheduled for January 27, 2026 at 10:00 am at the Police Jury Meeting Room in Mansfield. Bids are due February 3, 2026 at 10:00 am, with bidding documents available via BidExpress and through Ace Digital.
Posted Date
-
Due Date
Feb 3, 2026
Close: Feb 3, 2026
DeSoto Parish Police Jury is soliciting sealed and electronic bids for the Solid Waste Improvements at the Stonewall Compactor Site, including a new left turn lane on LA 171, a new asphalt roadway with soil-cement base and drainage, and construction of the compactor site with asphalt pavement, soil-cement, and a retaining wall. A mandatory pre-bid conference is scheduled for January 27, 2026 at 10:00 am at the Police Jury Meeting Room in Mansfield. Bids are due February 3, 2026 at 10:00 am, with bidding documents available via BidExpress and through Ace Digital.
Solid Waste Landfill facility that can offer access for unloading solid waste 24 hours a day, seven days a week. The solid waste will be delivered to the landfill facility by street sweeper trucks that are owned by Owner.
Posted Date
Jan 5, 2026
Due Date
Jan 28, 2026
Release: Jan 5, 2026
Close: Jan 28, 2026
Solid Waste Landfill facility that can offer access for unloading solid waste 24 hours a day, seven days a week. The solid waste will be delivered to the landfill facility by street sweeper trucks that are owned by Owner.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis