Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Solar array design and construction services.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
The Town of Craftsbury requests proposals for Solar PV Array and Battery Storage installation services for 2 buildings. The work is being carried out under the Municipal Energy Resilience Program (MERP) and is solely funded by a MERP grant from the Vermont Department of Buildings and General Services. Work is expected to commence upon signing of the contract and must be completed before December 31, 2026.
Posted Date
Dec 10, 2025
Due Date
Jan 16, 2026
Release: Dec 10, 2025
Close: Jan 16, 2026
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The Town of Craftsbury requests proposals for Solar PV Array and Battery Storage installation services for 2 buildings. The work is being carried out under the Municipal Energy Resilience Program (MERP) and is solely funded by a MERP grant from the Vermont Department of Buildings and General Services. Work is expected to commence upon signing of the contract and must be completed before December 31, 2026.
AvailableConstruction and commissioning of seven solar arrays. These systems will be deployed across seven remote interior Alaska communities. This includes procurement, delivery, installation, testing, and coordination of all components listed in the equipment responsibility matrix. Contractors must ensure proper site preparation, construct inverter huts per drawings, coordinate utility interconnection, and establish communication infrastructure.
Posted Date
Nov 25, 2025
Due Date
Jan 9, 2026
Release: Nov 25, 2025
Close: Jan 9, 2026
Construction and commissioning of seven solar arrays. These systems will be deployed across seven remote interior Alaska communities. This includes procurement, delivery, installation, testing, and coordination of all components listed in the equipment responsibility matrix. Contractors must ensure proper site preparation, construct inverter huts per drawings, coordinate utility interconnection, and establish communication infrastructure.
DESIGN-BUILD services for site evaluation, design, installation, operation and maintenance of the solar for all program.
Posted Date
Dec 5, 2025
Due Date
Jan 12, 2026
Release: Dec 5, 2025
Close: Jan 12, 2026
DESIGN-BUILD services for site evaluation, design, installation, operation and maintenance of the solar for all program.
AvailableCarroll County, NH issued an RFP to retain a contractor to install an approximately 100 kW AC behind-the-meter solar array to serve the Carroll County Department of Corrections in Ossipee, NH. The work includes fixed, rack-mounted bifacial solar panels, connection to the meter at the north end of the facility, and compliance with requirements to obtain 30% Federal Investment Tax Credits (including non-PFE materials). The project requires a mandatory site visit, must begin construction before July 4, 2026 (with at least 5% of cost incurred by that date), and targets completion and operational connection by November 30, 2026.
Posted Date
Dec 12, 2025
Due Date
Jan 12, 2026
Release: Dec 12, 2025
Close: Jan 12, 2026
Carroll County, NH issued an RFP to retain a contractor to install an approximately 100 kW AC behind-the-meter solar array to serve the Carroll County Department of Corrections in Ossipee, NH. The work includes fixed, rack-mounted bifacial solar panels, connection to the meter at the north end of the facility, and compliance with requirements to obtain 30% Federal Investment Tax Credits (including non-PFE materials). The project requires a mandatory site visit, must begin construction before July 4, 2026 (with at least 5% of cost incurred by that date), and targets completion and operational connection by November 30, 2026.