Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Construction and commissioning of seven solar arrays. These systems will be deployed across seven remote interior Alaska communities. This includes procurement, delivery, installation, testing, and coordination of all components listed in the equipment responsibility matrix. Contractors must ensure proper site preparation, construct inverter huts per drawings, coordinate utility interconnection, and establish communication infrastructure.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Close: Jan 9, 2026
Solar array design and construction services.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Carroll County, NH issued an RFP to retain a contractor to install an approximately 100 kW AC behind-the-meter solar array to serve the Carroll County Department of Corrections in Ossipee, NH. The work includes fixed, rack-mounted bifacial solar panels, connection to the meter at the north end of the facility, and compliance with requirements to obtain 30% Federal Investment Tax Credits (including non-PFE materials). The project requires a mandatory site visit, must begin construction before July 4, 2026 (with at least 5% of cost incurred by that date), and targets completion and operational connection by November 30, 2026.
Posted Date
Dec 12, 2025
Due Date
Jan 12, 2026
Release: Dec 12, 2025
Close: Jan 12, 2026
Carroll County, NH issued an RFP to retain a contractor to install an approximately 100 kW AC behind-the-meter solar array to serve the Carroll County Department of Corrections in Ossipee, NH. The work includes fixed, rack-mounted bifacial solar panels, connection to the meter at the north end of the facility, and compliance with requirements to obtain 30% Federal Investment Tax Credits (including non-PFE materials). The project requires a mandatory site visit, must begin construction before July 4, 2026 (with at least 5% of cost incurred by that date), and targets completion and operational connection by November 30, 2026.
AvailableTowed array subasse; NSN: 5845014169397.
Posted Date
Oct 13, 2025
Due Date
Feb 13, 2026
Release: Oct 13, 2025
Close: Feb 13, 2026
Towed array subasse; NSN: 5845014169397.
AvailableProvide covered parking array. Construction of two canopy structures constructed of tubular steel to support photovoltaic (PV) solar panels, installation of an integrated gutter and stormwater drainage system, a premanufactured battery storage building, and four dual-port EV charging stations.
Posted Date
Dec 12, 2025
Due Date
Jan 12, 2026
Release: Dec 12, 2025
Close: Jan 12, 2026
Provide covered parking array. Construction of two canopy structures constructed of tubular steel to support photovoltaic (PV) solar panels, installation of an integrated gutter and stormwater drainage system, a premanufactured battery storage building, and four dual-port EV charging stations.