Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project consists of RCP, the construction of a steel reinforced concrete structure associated with footings, walls, wall extensions and floor slabs. The construction will include earthwork, such as excavation, demolition of existing structures, clearing/grubbing, structure site preparation, compaction requirements, reshaping/backfilling, and restoration of the canal prism. Other work includes the furnishing and installation of miscellaneous metal (grating, gate guides and all other miscellaneous metal), furnishing and installation of slide gates and reclamation (seeding, fertilizing and mulching).
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Richmond dam spillway replacement.
Posted Date
Jan 29, 2026
Due Date
Mar 4, 2026
Release: Jan 29, 2026
Close: Mar 4, 2026
Richmond dam spillway replacement.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Provide spillway gate replacments. Replacement spillway gates components include: 1. Fabricate minimum five (5) and maximum eleven (11) new vertical lift steel spillway gates offsite Including paint, non-destructive testing (NDT), seals and seal heaters, cathodic protection, wheels, dogging and latching mechanisms. See attached file.
Posted Date
Apr 17, 2025
Due Date
Apr 29, 2028
Release: Apr 17, 2025
Close: Apr 29, 2028
Provide spillway gate replacments. Replacement spillway gates components include: 1. Fabricate minimum five (5) and maximum eleven (11) new vertical lift steel spillway gates offsite Including paint, non-destructive testing (NDT), seals and seal heaters, cathodic protection, wheels, dogging and latching mechanisms. See attached file.
AvailableRemove existing nord siphon piping and appurtenances, construct a replacement turnout structure, piping, outlet structure, and tie in replacement structure to the cross valley canal.
Posted Date
Dec 19, 2025
Due Date
Feb 3, 2026
Release: Dec 19, 2025
Close: Feb 3, 2026
Remove existing nord siphon piping and appurtenances, construct a replacement turnout structure, piping, outlet structure, and tie in replacement structure to the cross valley canal.
Provide inventory antibacterial soap as needed.
Posted Date
Feb 2, 2026
Due Date
Feb 16, 2026
Release: Feb 2, 2026
Close: Feb 16, 2026
Provide inventory antibacterial soap as needed.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →