OtherNY
Aug 19, 2026
Closes
Aug 24, 2026
Whell Motor- Snowrator, ZX4 Part#143-0875, left, SR#4320-19379 (Request for Quote)
Procurement for 2 EA of Whell Motor- Snowrator, ZX4 Part#143-0875, left, SR#4320-19379.
Description: Procurement for 4 EA of Snowrator SR4320 part#142-0004 Serial 19379 Hose ASM23.CR FSWJICX1; 4 EA of Snowrator SR4320 part#143-0079 Serial 19379 Hose 25.3/8 100R17 6FJIC90 6FJIC90 NC; 4 EA of Snowrator SR4320 part#143-0080 Serial 19379 Hose 31.5 3/8 100R17 6FJIC 6F JIC90 WRSR; 4 EA of Snowrator SR4320 part#143-0082 Serial 19379 Hose 45.75 3/8 100R17 6FJIC 6FJIC90 WR; 4 EA of Snowrator SR4320 part#143-0081 Serial 19379 Hose 53. 3/8 100R17 6FJIC 6FJIC90 WR; 4 EA of Snowrator SR4320 part#143-0086 Serial 19379 Hose 12.5 LO PR 3/8 100R6 6FJIC 6FJIC SR; 4 EA of Snowrator SR4320 part#143-0056 Serial 19379 Elbow 45.
Other · NY, US
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalAdjacent opportunities open for bidding right now.
OtherNY
Aug 19, 2026
Closes
Aug 24, 2026
Procurement for 2 EA of Whell Motor- Snowrator, ZX4 Part#143-0875, left, SR#4320-19379.
Aug 16, 2026
Closes
Aug 27, 2026
Parts kit, hydraulic; NSN 1730012061786, Qty 83 UI KT.
CityCA
-
Closes
Aug 21, 2026
Standalone wholesale provision and short-term lease of various water utility line inventory items (1 LS). Scope requires submitting digital pricing for individual electronic Line Items, encompassing bulk PVC (Polyvinyl Chloride) piping supply, plastic tubing networks, alignment couplings, replacement water/sewer equipment leasing arrays, and structural pipe valves/fittings.
FederalMT
Aug 17, 2026
Closes
Aug 26, 2026
Key tasks include the following: Task 1: Removal and Asset Disposal: A. The Contractor shall provide all labor, materials, tools, equipment, and supervision necessary to remove and legally dispose of the existing freezer components that are being replaced. a. Removal shall include system evacuation and disposal of old refrigerant. B. The Contractor shall perform a complete cleanup of the area, ensuring all debris is captured daily and prevented from blowing into the surrounding environment. See attached file.